skip to main content

King County Department of Assessments

Setting values, serving the community, and promoting fairness and equity.

Department of Assessments

201 South Jackson Street,
Seattle, WA 98104

Office Hours:
Mon - Fri
8:30 a.m. to 4:30 p.m.

TEL: 206-296-7300
TTY relay: 711 or 800-833-4388

Send us mail

 
PARCEL DATA
Parcel012605-9053
NameNORTHSHORE SCHOOL DIST #417
Site Address19301 168TH AVE NE 98072
Geo Area 90-40
Spec Area
Property NameLEOTA JR HIGH & WELINGTON ELEMENTARY
JurisdictionWOODINVILLE
Levy Code2505
Property Type C
Plat Block / Building Number
Plat Lot / Unit Number
Quarter-Section-Township-Range SW-1 -26-5
Legal Description
NW 1/4 OF SW 1/4 LESS BEG AT SE COR TH W 30 FT TO S MGN OF NE 190TH ST & POB TH N 00-28-51 E 241.08 FT TH S 88-53-12 W 120.06 FT TH S 00-28-51 W 37.50 FT TH S 88-49-12 W 170 FT TH N 01-45-42 W TAP 360 FT N OF S LN OF SUBD TH W 290 FT TH S 15 FT TAP 315 FT S OF N LN OF S 1/2 TH W 254 FT TH S TO S LN OF SUBD TH E TO BEG LESS CO RDS
PLat Block:
Plat Lot:


LAND DATA
 
Picture
Highest & Best Use As If VacantEDUCATIONAL SERVICE
Highest & Best Use As ImprovedPRESENT USE
Present UseSchool(Public)
Land SqFt1,461,438
Acres33.55
Percentage Unusable 
UnbuildableNO
Restrictive Size ShapeNO
ZoningP/I
WaterWATER DISTRICT
Sewer/SepticPUBLIC
Road AccessPUBLIC
ParkingADEQUATE
Street SurfacePAVED
Views Waterfront
Rainier
Territorial
Olympics
Cascades
Seattle Skyline
Puget Sound
Lake Washington
Lake Sammamish
Lake/River/Creek
Other View
Waterfront Location
Waterfront Footage0
Lot Depth Factor0
Waterfront Bank
Tide/Shore
Waterfront Restricted Access
Waterfront Access RightsNO
Poor QualityNO
Proximity InfluenceNO
Designations Nuisances
Historic Site
Current Use(none)
Nbr Bldg Sites 
Adjacent to Golf FairwayNO
Adjacent to GreenbeltNO
Other DesignationNO
Deed RestrictionsNO
Development Rights PurchasedNO
EasementsNO
Native Growth Protection EasementNO
DNR LeaseNO
 
Topography
Traffic Noise
Airport Noise 
Power LinesNO
Other NuisancesNO
Problems
Water ProblemsNO
Transportation ConcurrencyNO
Other ProblemsNO
Environmental
EnvironmentalNO

BUILDING
Building Number1
Building DescriptionWellington: Bldg "A"
Number Of Buildings Aggregated1
Predominant UseELEMENTARY SCHOOL (ENTIRE) (365)
ShapeVery Irreg
Construction ClassMASONRY
Building QualityAVERAGE/GOOD
Stories1
Building Gross Sq Ft17,160
Building Net Sq Ft17,160
Year Built1983
Eff. Year1990
Percentage Complete100
Heating SystemFORCED AIR UNIT
SprinklersNo
Elevators 
12345678910111213
Click the camera to see more pictures.
Picture of Building 1
Current Picture
Section(s) Of Building Number: 1
Section NumberSection UseDescriptionStoriesHeightFloor NumberGross Sq FtNet Sq Ft
1 ELEMENTARY SCHOOL (ENTIRE) (365) 110 17,16017,160

Accessory
Accessory TypePictureDescriptionQtyUnit Of MeasureSizeGradeEff Yr%ValueDate Valued
Canopies Wellington Play Shed1Square Feet768AVERAGE / GOOD1990100400012/29/2004
 





TAX ROLL HISTORY

This is a government owned parcel.
Change to state law (RCW 84. 40.045 and 84.40.175) by the 2013 Legislature eliminated revaluation of government owned parcels.

SALES HISTORY


REVIEW HISTORY


PERMIT HISTORY

Permit NumberPermit DescriptionTypeIssue DatePermit ValueIssuing JurisdictionReviewed Date
COB24040 The proposed project is the first phase of a site wide modernization and master plan at Leota Middle School. The proposed phase 1 construction scope includes the construction of a 3-story classroom addition adjacent to the existing school that will Remodel4/16/2025$16,173,634WOODINVILLE6/6/2025
BLD24053 Construction of stormwater detention vaults (R-Tank) related to the work associated with the Leota Middle School Classroom Addition (Permit File No. COB24040). Runoff from the pollution generating impervious areas will be captured by a series of caOther4/16/2025$530,081WOODINVILLE 
COB24026 The scope of this project is to replace (5) single classroom portables with (2) double classroom portables on the site of Leota Middle School to prepare for the construction of phase 1 of the Leota Middle School replacement project (to be submitted uRemodel9/20/2024$170,170WOODINVILLE3/18/2025
DEM24007 Phase 1 schedule start is 7/29/24, and consists of 5 portable classrooms to demo, and a covered awning section. Phase 2 is scheduled for December 2025, and consists of two portables and the admin building., Demolition7/9/2024$0WOODINVILLE3/18/2025
BLD20021 Replace floor and wall finishes, restroom accessories and lighting fixtures in the student restrooms., Remodel6/28/2021$37,365WOODINVILLE5/23/2023
BLD11021 Public add/altRemodel3/14/2011$105,000WOODINVILLE8/13/2012
Building, New6/29/1996$1,700,000  
Demolition6/28/1996$0  
Remodel6/30/1995$0  

HOME IMPROVEMENT EXEMPTION