COB24040
| The proposed project is the first phase of a site wide modernization and master plan at Leota Middle School. The proposed phase 1 construction scope includes the construction of a 3-story classroom addition adjacent to the existing school that will | Remodel | 4/16/2025 | $16,173,634 | WOODINVILLE | 6/6/2025 |
|
BLD24053
| Construction of stormwater detention vaults (R-Tank) related to the work associated with the Leota Middle School Classroom Addition (Permit File No. COB24040). Runoff from the pollution generating impervious areas will be captured by a series of ca | Other | 4/16/2025 | $530,081 | WOODINVILLE | |
|
COB24026
| The scope of this project is to replace (5) single classroom portables with (2) double classroom portables on the site of Leota Middle School to prepare for the construction of phase 1 of the Leota Middle School replacement project (to be submitted u | Remodel | 9/20/2024 | $170,170 | WOODINVILLE | 3/18/2025 |
|
DEM24007
| Phase 1 schedule start is 7/29/24, and consists of 5 portable classrooms to demo, and a covered awning section. Phase 2 is scheduled for December 2025, and consists of two portables and the admin building., | Demolition | 7/9/2024 | $0 | WOODINVILLE | 3/18/2025 |
|
BLD20021
| Replace floor and wall finishes, restroom accessories and lighting fixtures in the student restrooms., | Remodel | 6/28/2021 | $37,365 | WOODINVILLE | 5/23/2023 |
|
BLD11021
| Public add/alt | Remodel | 3/14/2011 | $105,000 | WOODINVILLE | 8/13/2012 |
|
| | Building, New | 6/29/1996 | $1,700,000 | | |
|
| | Demolition | 6/28/1996 | $0 | | |
|
| | Remodel | 6/30/1995 | $0 | | |