| Parcel | 152605-9042 |
| Name | RH INVESTMENT HOLDINGS LLC |
| Site Address | 14300 NE 145TH ST 98072 |
| Geo Area |
90-25
|
| Spec Area |
540-50
|
| Property Name | DELILLE CELLARS / SPARKMAN CELLARS |
|
| Jurisdiction | WOODINVILLE |
| Levy Code | 2505 |
| Property Type |
C
|
| Plat Block / Building Number | |
| Plat Lot / Unit Number | |
| Quarter-Section-Township-Range |
SE-15-26-5
|
|
|
Click the camera to see more pictures.
|
| Highest & Best Use As If Vacant | MANUFACTURING |
| Highest & Best Use As Improved | PRESENT USE |
| Present Use | Industrial(Light) |
| Land SqFt | 818,057 |
| Acres | 18.78 |
|
| Percentage Unusable | |
| Unbuildable | NO |
| Restrictive Size Shape | NO |
| Zoning | T/I |
| Water | WATER DISTRICT |
| Sewer/Septic | PUBLIC |
| Road Access | PUBLIC |
| Parking | ADEQUATE |
| Street Surface | PAVED |
|
|
Views |
Waterfront |
| Rainier | |
| Territorial | |
| Olympics | |
| Cascades | |
| Seattle Skyline | |
| Puget Sound | |
| Lake Washington | |
| Lake Sammamish | |
| Lake/River/Creek | |
| Other View | |
|
| Waterfront Location | |
| Waterfront Footage | 0 |
| Lot Depth Factor | 0 |
| Waterfront Bank | |
| Tide/Shore | |
| Waterfront Restricted Access | |
| Waterfront Access Rights | NO |
| Poor Quality | NO |
| Proximity Influence | NO |
|
|
Designations |
Nuisances |
| Historic Site | |
| Current Use | (none) |
| Nbr Bldg Sites | |
| Adjacent to Golf Fairway | NO |
| Adjacent to Greenbelt | NO |
| Other Designation | NO |
| Deed Restrictions | NO |
| Development Rights Purchased | NO |
| Easements | NO |
| Native Growth Protection Easement | NO |
| DNR Lease | NO |
|
| Topography | |
| Traffic Noise | |
| Airport Noise | |
| Power Lines | NO |
| Other Nuisances | NO |
|
|
Problems |
| Water Problems | NO |
| Transportation Concurrency | NO |
| Other Problems | NO |
|
|
Environmental |
|
Section(s) Of Building Number:
1
|
4
| OFFICE BUILDING (344) | Offices | 1 | 11 | 2 | 12,736 | 12,736 |
|
1
| RESTAURANT, TABLE SERVICE (350) | Includes small retail area | 1 | 15 | 1 | 6,059 | 6,059 |
|
3
| OFFICE BUILDING (344) | Offices | 1 | 11 | 1 | 6,677 | 6,677 |
|
| 152605904209 | 2024 | 2025 | | 2505 | 8,900,000 | 10,364,600 | 19,264,600 | 0 | 8,900,000 | 10,364,600 | 19,264,600 | |
| 152605904209 | 2023 | 2024 | | 2505 | 8,900,000 | 11,165,400 | 20,065,400 | 0 | 8,900,000 | 11,165,400 | 20,065,400 | |
| 152605904209 | 2022 | 2023 | | 2505 | 8,893,000 | 10,056,700 | 18,949,700 | 0 | 8,893,000 | 10,056,700 | 18,949,700 | |
| 152605904209 | 2021 | 2022 | | 2505 | 8,893,000 | 8,756,300 | 17,649,300 | 0 | 8,893,000 | 8,756,300 | 17,649,300 | |
| 152605904209 | 2020 | 2021 | | 2505 | 8,893,000 | 8,865,900 | 17,758,900 | 387,600 | 8,893,000 | 8,865,900 | 17,758,900 | |
| 152605904209 | 2019 | 2020 | | 2505 | 7,680,400 | 8,528,800 | 16,209,200 | 1,431,900 | 7,680,400 | 8,528,800 | 16,209,200 | |
| 152605904209 | 2018 | 2019 | | 2505 | 6,872,000 | 7,096,900 | 13,968,900 | 0 | 6,872,000 | 7,096,900 | 13,968,900 | |
| 152605904209 | 2017 | 2018 | | 2505 | 6,053,600 | 6,867,800 | 12,921,400 | 0 | 6,053,600 | 6,867,800 | 12,921,400 | |
| 152605904209 | 2016 | 2017 | | 2505 | 6,053,600 | 7,063,300 | 13,116,900 | 0 | 6,053,600 | 7,063,300 | 13,116,900 | |
| 152605904209 | 2015 | 2016 | | 2505 | 6,053,600 | 5,704,700 | 11,758,300 | 0 | 6,053,600 | 5,704,700 | 11,758,300 | |
| 152605904209 | 2014 | 2015 | | 2505 | 6,053,600 | 5,804,600 | 11,858,200 | 0 | 6,053,600 | 5,804,600 | 11,858,200 | |
| 152605904209 | 2013 | 2014 | | 2505 | 6,053,600 | 5,848,200 | 11,901,800 | 81,600 | 6,053,600 | 5,848,200 | 11,901,800 | |
| 152605904209 | 2012 | 2013 | | 2505 | 6,053,600 | 5,745,700 | 11,799,300 | 0 | 6,053,600 | 5,745,700 | 11,799,300 | |
| 152605904209 | 2011 | 2012 | | 2505 | 6,061,800 | 5,852,800 | 11,914,600 | 0 | 6,061,800 | 5,852,800 | 11,914,600 | |
| 152605904209 | 2010 | 2011 | | 2505 | 6,063,500 | 3,497,500 | 9,561,000 | 0 | 6,063,500 | 3,497,500 | 9,561,000 | |
| 152605904209 | 2009 | 2010 | | 2505 | 8,998,600 | 1,778,000 | 10,776,600 | 0 | 8,998,600 | 1,778,000 | 10,776,600 | |
| 152605904209 | 2008 | 2009 | | 2505 | 8,180,500 | 2,455,700 | 10,636,200 | 0 | 8,180,500 | 2,455,700 | 10,636,200 | |
| 152605904209 | 2007 | 2008 | | 2505 | 6,544,400 | 3,486,800 | 10,031,200 | 0 | 6,544,400 | 3,486,800 | 10,031,200 | |
| 152605904209 | 2006 | 2007 | | 2505 | 6,544,400 | 4,290,200 | 10,834,600 | 0 | 6,544,400 | 4,290,200 | 10,834,600 | |
| 152605904209 | 2005 | 2006 | | 2505 | 5,726,300 | 3,751,400 | 9,477,700 | 0 | 5,726,300 | 3,751,400 | 9,477,700 | |
| 152605904209 | 2004 | 2005 | | 2505 | 6,544,400 | 2,174,800 | 8,719,200 | 0 | 6,544,400 | 2,174,800 | 8,719,200 | |
| 152605904209 | 2003 | 2004 | | 2505 | 6,544,400 | 6,565,400 | 13,109,800 | 0 | 6,544,400 | 6,565,400 | 13,109,800 | |
| 152605904209 | 2002 | 2003 | | 2505 | 5,726,300 | 7,340,300 | 13,066,600 | 0 | 5,726,300 | 7,340,300 | 13,066,600 | |
| 152605904209 | 2001 | 2002 | | 2505 | 3,272,200 | 7,701,600 | 10,973,800 | 0 | 3,272,200 | 7,701,600 | 10,973,800 | |
| 152605904209 | 2000 | 2001 | | 2505 | 2,658,600 | 8,242,800 | 10,901,400 | 0 | 2,658,600 | 8,242,800 | 10,901,400 | |
| 152605904209 | 1999 | 2000 | | 2505 | 2,658,600 | 8,664,468 | 11,323,068 | 0 | 2,658,600 | 8,664,468 | 11,323,068 | |
| 152605904209 | 1998 | 1999 | | 2505 | 1,547,700 | 8,664,468 | 10,212,168 | 0 | 1,547,700 | 8,664,468 | 10,212,168 | |
| 152605904209 | 1997 | 1998 | | 2505 | 0 | 0 | 0 | 0 | 1,547,700 | 3,361,900 | 4,909,600 | |
| 152605904209 | 1996 | 1997 | | 2505 | 0 | 0 | 0 | 0 | 1,547,700 | 3,361,900 | 4,909,600 | |
| 152605904209 | 1995 | 1996 | | 2505 | 0 | 0 | 0 | 0 | 1,547,700 | 3,361,900 | 4,909,600 | |
| 152605904209 | 1994 | 1995 | | 2505 | 0 | 0 | 0 | 0 | 1,547,700 | 2,857,600 | 4,405,300 | |
| 152605904209 | 1993 | 1994 | | 2505 | 0 | 0 | 0 | 0 | 1,858,300 | 0 | 1,858,300 | |
| 152605904209 | 1992 | 1993 | | 7570 | 0 | 0 | 0 | 0 | 1,156,500 | 6,000 | 1,162,500 | |
| 152605904209 | 1990 | 1991 | | 7570 | 0 | 0 | 0 | 0 | 1,156,500 | 6,000 | 1,162,500 | |
| 152605904209 | 1988 | 1989 | | 7570 | 0 | 0 | 0 | 0 | 1,040,900 | 5,000 | 1,045,900 | |
| 152605904209 | 1986 | 1987 | | 7570 | 0 | 0 | 0 | 0 | 207,900 | 5,000 | 212,900 | |
| 152605904209 | 1984 | 1985 | | 7570 | 0 | 0 | 0 | 0 | 108,300 | 14,100 | 122,400 | |
| 152605904209 | 1982 | 1983 | | 7570 | 0 | 0 | 0 | 0 | 108,300 | 14,100 | 122,400 | |
|
|
2910801
|
20180112001535
|
1/12/2018
| $11,000,000.00 | CRAFT BREW ALLIANCE INC+RH INVESTMENT HOLDINGS LLC | RH INVESTMENT HOLDINGS LLC | Statutory Warranty Deed | None |
|
1382304
|
199406280504
|
4/28/1994
| $0.00 | REDHOOD ALE BREWERY INC | WASHINGTON STATE DEPT OF TRANS | Warranty Deed | Other |
|
1324095
|
199308101756
|
8/9/1993
| $3,200,000.00 | FIRST WESTERN DEVELOPMENT OF | REDHOOK ALE BREWERY INC | Warranty Deed | None |
|
| 2008 | 0701305 | Local Appeal | $11,211,500 | 1/1/1900 | $0 | | Completed |
| 2001 | 0004443 | Local Appeal | $16,171,400 | 1/1/1900 | $0 | | Completed |
|
|
SIG23021
| We will be installing 1 illuminated building sign (roof mounted)., | Other | 11/2/2023 | $0 | WOODINVILLE | |
|
BLD23112
| Waste water treatment system to be added to a winery production facility. New exterior slab, foundation support, and architectural screening provided for exterior equipment., | Remodel | 9/22/2023 | $313,250 | WOODINVILLE | |
|
SIG23020
| Replace sign faces on existing monument sign with new designs and tenant info., | Other | 6/12/2023 | $0 | WOODINVILLE | |
|
SIG23004
| Installation of 1 halo lit channel letter sign., | Other | 3/9/2023 | $0 | WOODINVILLE | |
|
SIG22002
| Fabricate and install "The Deck" building mounted blade sign., | Other | 1/28/2022 | $0 | WOODINVILLE | 9/9/2022 |
|
BLD21097
| Expansion of existing wine storage and production area into adjacent TI area of existing warehouse building, | Remodel | 8/17/2021 | $325,000 | WOODINVILLE | 9/9/2022 |
|
BLD21026
| Verizon is proposing to modify an existing wireless communication facility. There are no additional antennas proposed and no ground disturbance. The scope of work will include the removal of 12 antennas and 9 RRU's. The installation of 3 RRU/Antenna | Remodel | 8/2/2021 | $20,000 | WOODINVILLE | 9/9/2022 |
|
PLM21027
| Demo existing trench drains and added (2) new trench drainage system to tie into existing combination waste and vent system below floor, | Other | 6/3/2021 | $10,500 | WOODINVILLE | 10/5/2021 |
|
SIG21004
| Fabricate and install "DELILLE CELLARS" sign. Sign is to be illuminated channel letters mounted to building awning., | Other | 2/23/2021 | $0 | WOODINVILLE | 10/5/2021 |
|
SIG19031
| Fabricate and install one (1) double sided (angled) internally illuminated monument sign (Hollywood Station), | Other | 2/12/2021 | $0 | WOODINVILLE | 10/5/2021 |
|
SIG20006
| Manufacture and install (1) new single-faced wall mount illuminated logo sign display and (1) new double-faced illuminated suspended sign display., | Other | 12/2/2020 | $0 | WOODINVILLE | 10/5/2021 |
|
BLD20089
| Remove 6 existing antennas, 3 TMA's, add 3 antennas, 3 remote radio units (RRU's), 3 Diplexers, and ancillary equipment to existing facility., | Remodel | 9/23/2020 | $15,000 | WOODINVILLE | 10/5/2021 |
|
MEC19227
| INSTALL WALK IN COOLER, | Other | 12/10/2019 | $0 | WOODINVILLE | 3/24/2020 |
|
COB19026
| NEW PLUMBING and HVAC for WINERY TENANT IMPROVEMENT, | Remodel | 10/10/2019 | $0 | WOODINVILLE | 9/3/2020 |
|
MEC19190
| To supply and install 2-connections to indoor fire pits., | Other | 9/25/2019 | $2,630 | WOODINVILLE | 3/24/2020 |
|
MEC19172
| Tenant improvement to existing office spaces. Relocating duct work to accommodate new floor plan, and adding GRDs and exhaust fan per plans., | Other | 8/20/2019 | $12,500 | WOODINVILLE | 3/24/2020 |
|
PLM19032
| To plumb and install per code 1-hand sink., | Other | 7/12/2019 | $1,500 | WOODINVILLE | 3/24/2020 |
|
BLD18034
| PROPOSING TASTING ROOM AND EVENT SPACE WITH ASSOCIATED BUILDING OF TOILET ROOM AND STORAGE ROOM FOR WINE BARRELS., | Remodel | 7/10/2019 | $300,000 | WOODINVILLE | 10/1/2020 |
|
BLD19051
| interior tenant improvement of existing office spaces . TI to include dividing large open office space to smaller enclosed offices; removal of storage closet wall and door; general finish upgrades including replacing ceiling and carpet tile, new ligh | Remodel | 6/17/2019 | $157,000 | WOODINVILLE | 10/1/2020 |
|
MEC19071
| Commercial building with new ductwork, split system, heat pumps, and ventilation to common areas, per plans., | Other | 5/21/2019 | $150,000 | WOODINVILLE | 7/1/2019 |
|
BLD19030
| Interior renovations to an existing restaurant and pub space., | Remodel | 5/13/2019 | $465,500 | WOODINVILLE | 5/15/2020 |
|
BLD18116
| Renovation of a portion of existing brewery production facility to house tasting rooms and offices. 2 stories will be added to existing 1 story portion of building; A mezzanine will be added above production floor to house offices. Production area wa | Remodel | 4/19/2019 | $2,000,000 | WOODINVILLE | 10/1/2020 |
|
BLD19010
| Install a total of (7) bays of high-piled pallet rack materials with up to three 96´┐¢ beam levels per bay. Top beam elevation not to exceed 16´┐¢ (192´┐¢). All pallet rack shelf supports are wire deck´┐¢no solid shelves., | Remodel | 3/4/2019 | $5,500 | WOODINVILLE | 5/1/2019 |
|
PLM19003
| TO PLUMB AND INSTALL ELEVEN (11) SINKS, NINE (9) WATER CLOSETS, EIGHT (8) FLOOR SINKS, THREE (3) LAVS, TWO (2) EEMAX TANKLESS HEATERS, ONE (1) DISH WASH, ONE (1) GREASE TRAP, ONE (1) MOP SINK, ONE (1) ICE MAKER, AND ONE (1) HOT WATER TANK, | Other | 2/15/2019 | $114,980 | WOODINVILLE | 7/1/2019 |
|
MEC19004
| INSTALLATION OF HYDRONIC PIPING, | Other | 1/16/2019 | $80,000 | WOODINVILLE | 7/1/2019 |
|
MEC18219
| Installation of two (2) gas unit heaters, two (2) exhaust fans, two (2) roof hoods, one (1) louver, ductwork, and grilles/diffusers., | Other | 11/29/2018 | $29,875 | WOODINVILLE | 7/1/2019 |
|
PLM18047
| PHASE 1 - PLUMBING. ADD TRENCH DRAINS TO EXISTING FLOOR. ADD 5 TANKLESS HWT. ADD 5 H/C HOSE BIBS PIPE DROPS IN 5 LOCATIONS. GAS PIPING FOR TWO UNIT HEATERS. ONE BACK FLOW PREVENTER., | Other | 10/26/2018 | $0 | WOODINVILLE | 5/3/2019 |
|
SIG18028
| NEW SIGNAGE to INCLUDE 3 SIGN ELEMENTS. ENTRY SIGN, DRIVEWAY SIGN, AND TWO READER BOARD SIGNS., | Other | 10/24/2018 | $0 | WOODINVILLE | 5/1/2019 |
|
DEM18012
| DEMO OF EXTERIOR SIDING AND STUD FRAMING. REMOVAL OF STRUCTURE ABOVE STEEL FRAMEWORK., | Demolition | 10/23/2018 | $0 | WOODINVILLE | 5/3/2019 |
|
BLD18090
| AT&T is proposing to modify an existing wireless facility located on a rooftop. The facility is in a screen copula on the roof and our proposal will not modify the exterior. The project consists of the replacement of (4) antennas. There will be a | Remodel | 10/5/2018 | $30,000 | WOODINVILLE | 10/5/2021 |
|
BLD18073
| PHASE 1 - WINE PRODUCTION 7 BARREL STORAGE TI AND ROOF REPAIR, | Remodel | 8/30/2018 | $500,000 | WOODINVILLE | 5/15/2020 |
|
COB18090
| REMOVE EQUIPMENT, INSTALL NEW U-CRETE FLOORING, NEW CEILING TILES, AND FRP ON WALLS. RE-INSTALL EXISTING EQUIPMENT AND RECONNECT., | Remodel | 8/20/2018 | $0 | WOODINVILLE | 5/3/2019 |
|
DEM18009
| REMOVE 88" OF NON BARING WALL 13'.5" TALL, REPAIR 43' OF NON BARING WLAL 13'.5" TALL, | Demolition | 8/1/2018 | $0 | WOODINVILLE | 5/3/2019 |
|
BLD12044
| NON-RES ADD: RENOVATION OF BREWERY RESTAURANT AND OUTDOOR EATING AREA.
ASSOCIATED WITH DRA12003, | Remodel | 2/6/2013 | $720,869 | WOODINVILLE | 5/16/2016 |
|
|
|
|