Parcel | 162404-9193 |
Name | UNITED STATES |
Site Address | 1660 S COLUMBIAN WAY 98108 |
Geo Area |
40-40
|
Spec Area |
|
Property Name | PUGET SOUND HEALTH CARE SYSTEM - V.A. HOSPITAL |
|
Jurisdiction | SEATTLE |
Levy Code | 0013 |
Property Type |
C
|
Plat Block / Building Number | |
Plat Lot / Unit Number | |
Quarter-Section-Township-Range |
SW-16-24-4
|
|
|
Highest & Best Use As If Vacant | COMMERCIAL SERVICE |
Highest & Best Use As Improved | PRESENT USE |
Present Use | Hospital |
Land SqFt | 2,230,707 |
Acres | 51.21 |
|
Percentage Unusable | |
Unbuildable | NO |
Restrictive Size Shape | NO |
Zoning | MIO-105-LR3 (M) |
Water | WATER DISTRICT |
Sewer/Septic | PUBLIC |
Road Access | PUBLIC |
Parking | ADEQUATE |
Street Surface | PAVED |
|
Views |
Waterfront |
Rainier | |
Territorial | |
Olympics | |
Cascades | |
Seattle Skyline | |
Puget Sound | |
Lake Washington | |
Lake Sammamish | |
Lake/River/Creek | |
Other View | |
|
Waterfront Location | |
Waterfront Footage | 0 |
Lot Depth Factor | 0 |
Waterfront Bank | |
Tide/Shore | |
Waterfront Restricted Access | |
Waterfront Access Rights | NO |
Poor Quality | NO |
Proximity Influence | NO |
|
Designations |
Nuisances |
Historic Site | |
Current Use | (none) |
Nbr Bldg Sites | |
Adjacent to Golf Fairway | NO |
Adjacent to Greenbelt | NO |
Other Designation | NO |
Deed Restrictions | NO |
Development Rights Purchased | NO |
Easements | NO |
Native Growth Protection Easement | NO |
DNR Lease | NO |
|
Topography | |
Traffic Noise | |
Airport Noise | |
Power Lines | NO |
Other Nuisances | NO |
|
Problems |
Water Problems | NO |
Transportation Concurrency | NO |
Other Problems | NO |
|
Environmental |
|
Section(s) Of Building Number:
1
1
| MEDICAL OFFICE (341) | | 9 | 9 | | 148,485 | 148,485 |
2
| BASEMENT, OFFICE (705) | | 1 | 9 | | 56,770 | 56,770 |
3
| BASEMENT, UNFINISHED (703) | | 1 | 9 | | 13,550 | 0 |
|
Change to state law (RCW 84. 40.045 and 84.40.175) by the 2013 Legislature eliminated revaluation of government owned parcels. |
|
|
|
6967939-CN
| Construct alterations to an existing institutional building at the rooftop level minor communications antenna facility (Sprint / T-Mobile) and at equipment room, per plan., | Remodel | 7/31/2023 | $20,000 | SEATTLE | 4/5/2024 |
|
|