Parcel | 788260-0083 |
Name | 503 2ND LLC |
Site Address | 501 2ND AVE S 98003 |
Geo Area |
85-65
|
Spec Area |
|
Property Name | Magnolia at Moss Bay |
|
Jurisdiction | KIRKLAND |
Levy Code | 1701 |
Property Type |
C
|
Plat Block / Building Number | |
Plat Lot / Unit Number | 8 & 9 |
Quarter-Section-Township-Range |
NW-8 -25-5
|
|
Click the camera to see more pictures.
|
Highest & Best Use As If Vacant | MULTI-FAMILY DWELLING |
Highest & Best Use As Improved | PRESENT USE |
Present Use | Townhouse Plat |
Land SqFt | 24,512 |
Acres | 0.56 |
|
Percentage Unusable | |
Restrictive Size Shape | NO |
Zoning | PLA 6D |
Water | WATER DISTRICT |
Sewer/Septic | PUBLIC |
Road Access | PUBLIC |
Parking | ADEQUATE |
Street Surface | PAVED |
|
Views |
Waterfront |
Rainier | |
Territorial | |
Olympics | |
Cascades | |
Seattle Skyline | |
Puget Sound | |
Lake Washington | |
Lake Sammamish | |
Lake/River/Creek | |
Other View | |
|
Waterfront Location | |
Waterfront Footage | 0 |
Lot Depth Factor | 0 |
Waterfront Bank | |
Tide/Shore | |
Waterfront Restricted Access | |
Waterfront Access Rights | NO |
Poor Quality | NO |
Proximity Influence | NO |
|
Designations |
Nuisances |
Historic Site | |
Current Use | (none) |
Nbr Bldg Sites | |
Adjacent to Golf Fairway | NO |
Adjacent to Greenbelt | NO |
Other Designation | NO |
Deed Restrictions | NO |
Development Rights Purchased | NO |
Easements | YES |
Native Growth Protection Easement | NO |
DNR Lease | NO |
|
Topography | YES |
Traffic Noise | |
Airport Noise | |
Power Lines | NO |
Other Nuisances | YES |
|
Problems |
Water Problems | NO |
Transportation Concurrency | NO |
Other Problems | NO |
|
Environmental |
|
Section(s) Of Building Number:
1
1
| MULTIPLE RESIDENCE (LOW RISE) (352) | 3 units | 3 | 10 | | 7,002 | 7,002 |
|
788260008305 | 2023 | 2024 | | 1701 | 3,921,900 | 1,733,500 | 5,655,400 | 1,733,500 | 3,921,900 | 1,733,500 | 5,655,400 | |
788260008305 | 2022 | 2023 | | 1701 | 2,745,300 | 0 | 2,745,300 | 0 | 2,745,300 | 0 | 2,745,300 | |
788260008305 | 2021 | 2022 | | 1701 | 2,048,100 | 0 | 2,048,100 | 0 | 2,048,100 | 0 | 2,048,100 | |
788260008305 | 2020 | 2021 | | 1701 | 2,048,100 | 657,900 | 2,706,000 | 0 | 2,048,100 | 657,900 | 2,706,000 | |
788260008305 | 2019 | 2020 | | 1701 | 2,048,100 | 578,900 | 2,627,000 | 0 | 2,048,100 | 578,900 | 2,627,000 | |
788260008305 | 2018 | 2019 | | 1701 | 1,901,800 | 205,200 | 2,107,000 | 0 | 1,901,800 | 205,200 | 2,107,000 | |
788260008305 | 2017 | 2018 | | 1701 | 1,755,500 | 93,500 | 1,849,000 | 0 | 1,755,500 | 93,500 | 1,849,000 | |
788260008305 | 2016 | 2017 | | 1700 | 1,462,900 | 226,100 | 1,689,000 | 0 | 1,462,900 | 226,100 | 1,689,000 | |
788260008305 | 2015 | 2016 | | 1700 | 1,361,700 | 190,300 | 1,552,000 | 0 | 1,361,700 | 190,300 | 1,552,000 | |
788260008305 | 2014 | 2015 | | 1700 | 1,361,700 | 1,000 | 1,362,700 | 0 | 1,361,700 | 1,000 | 1,362,700 | |
788260008305 | 2013 | 2014 | | 1700 | 1,361,700 | 1,000 | 1,362,700 | 0 | 1,361,700 | 1,000 | 1,362,700 | |
788260008305 | 2012 | 2013 | | 1700 | 1,361,700 | 1,000 | 1,362,700 | 0 | 1,361,700 | 1,000 | 1,362,700 | |
788260008305 | 2011 | 2012 | | 1700 | 1,361,700 | 1,000 | 1,362,700 | 0 | 1,361,700 | 1,000 | 1,362,700 | |
788260008305 | 2010 | 2011 | | 1700 | 1,609,300 | 1,000 | 1,610,300 | 0 | 1,609,300 | 1,000 | 1,610,300 | |
788260008305 | 2009 | 2010 | | 1700 | 1,609,300 | 1,000 | 1,610,300 | 0 | 1,609,300 | 1,000 | 1,610,300 | |
788260008305 | 2008 | 2009 | | 1700 | 1,485,500 | 1,000 | 1,486,500 | 0 | 1,485,500 | 1,000 | 1,486,500 | |
788260008305 | 2007 | 2008 | | 1700 | 1,238,000 | 1,000 | 1,239,000 | 0 | 1,238,000 | 1,000 | 1,239,000 | |
788260008305 | 2006 | 2007 | | 1700 | 1,064,600 | 23,400 | 1,088,000 | 0 | 1,064,600 | 23,400 | 1,088,000 | |
788260008305 | 2005 | 2006 | | 1700 | 990,400 | 1,000 | 991,400 | 0 | 990,400 | 1,000 | 991,400 | |
788260008305 | 2004 | 2005 | | 1700 | 990,400 | 1,000 | 991,400 | 0 | 990,400 | 1,000 | 991,400 | |
788260008305 | 2003 | 2004 | | 1700 | 990,400 | 1,000 | 991,400 | 0 | 990,400 | 1,000 | 991,400 | |
788260008305 | 2002 | 2003 | | 1700 | 990,400 | 1,000 | 991,400 | 0 | 990,400 | 1,000 | 991,400 | |
788260008305 | 2001 | 2002 | | 1700 | 234,100 | 369,900 | 604,000 | 0 | 234,100 | 369,900 | 604,000 | |
788260008305 | 2000 | 2001 | | 1700 | 234,100 | 369,900 | 604,000 | 0 | 234,100 | 369,900 | 604,000 | |
788260008305 | 1999 | 2000 | | 1700 | 234,100 | 334,500 | 568,600 | 0 | 234,100 | 334,500 | 568,600 | |
788260008305 | 1998 | 1999 | | 1700 | 234,100 | 334,500 | 568,600 | 0 | 234,100 | 334,500 | 568,600 | |
788260008305 | 1997 | 1998 | | 1700 | 0 | 0 | 0 | 0 | 234,100 | 190,900 | 425,000 | |
788260008305 | 1996 | 1997 | | 1700 | 0 | 0 | 0 | 0 | 234,100 | 190,900 | 425,000 | |
788260008305 | 1994 | 1995 | | 1700 | 0 | 0 | 0 | 0 | 234,100 | 190,900 | 425,000 | |
788260008305 | 1992 | 1993 | | 1700 | 0 | 0 | 0 | 0 | 234,100 | 169,100 | 403,200 | |
788260008305 | 1990 | 1991 | | 1700 | 0 | 0 | 0 | 0 | 115,200 | 265,000 | 380,200 | |
788260008305 | 1988 | 1989 | | 1700 | 0 | 0 | 0 | 0 | 115,200 | 242,000 | 357,200 | |
788260008305 | 1987 | 1988 | | 1700 | 0 | 0 | 0 | 0 | 65,800 | 291,400 | 357,200 | |
788260008305 | 1986 | 1987 | | 1700 | 0 | 0 | 0 | 0 | 65,800 | 0 | 65,800 | |
788260008305 | 1984 | 1985 | | 1700 | 0 | 0 | 0 | 0 | 77,700 | 0 | 77,700 | |
788260008305 | 1982 | 1983 | | 1700 | 0 | 0 | 0 | 0 | 67,600 | 0 | 67,600 | |
|
3102388
|
20210302001342
|
1/6/2021
| $0.00 | 503 2ND LLC | KIRKLAND CITY OF | Statutory Warranty Deed | Other |
3026209
|
20191218001680
|
12/11/2019
| $3,999,400.00 | WALKER FAMILY REALTY LLC | 503 2ND LLC | Statutory Warranty Deed | None |
2794079
|
20160503001640
|
4/29/2016
| $0.00 | WALKER D BRUCE+CAROL A | WALKER FAMILY REALTY LLC | Statutory Warranty Deed | Other |
1027760
|
198810200364
|
10/14/1988
| $385,000.00 | SUTHERLAND WALLACE+SANDRA | WALKER D BRUCE+CAROL A | Warranty Deed | None |
|
|
MMF22-06716
| Magnolia - Bldg 4 (BMF20-06613): Install mechanical per plans, | Other | 3/17/2023 | $20,000 | KIRKLAND | |
MMF22-07058
| Magnolia - Bldg 2: Install HVAC mechanical per plan., | Other | 10/19/2022 | $45,000 | KIRKLAND | |
MMF22-06668
| SHELTER-LINCOLN at Moss Bay (Bldg 3) (BMF20-06527): Install mechanical per plans, | Other | 10/19/2022 | $45,000 | KIRKLAND | |
MMF22-05445
| Magnolia Bld 1: Install mechanical equipment per plans (BMF20-05502), | Other | 8/30/2022 | $45,000 | KIRKLAND | |
EMF22-05210
| MAGNOLIA TOWNHOMES BLDG 4 UNITS A-C(BMF20-06613)- CONDUIT INSTALL, COVER, SERVICE, LOW VOLTAGE PH/TV/DATA, | | 8/19/2022 | $50,000 | KIRKLAND | |
EMF22-05209
| MAGNOLIA TOWNHOMES BLDG 3 UNITS A-D (BMF20-06527)- CONDUIT INSTALL, COVER, SERVICE, LOW VOLTAGE (PHONES/TV/DATA), | | 8/19/2022 | $50,000 | KIRKLAND | |
EMF22-05208
| MAGNOLIA TOWNHOMES BLDG 2 UNITS A-C(BMF20-05990)- CONDUIT INSTALL, COVER, SERVICE, LOW VOLTAGE PHONES/TV/DATA, | | 8/19/2022 | $50,000 | KIRKLAND | |
EMF22-05169
| MAGNOLIA TOWNHOMES BLDG 1 (BMF20-05502)UNITS A-C: CONDUIT, COVER, SERVICE, LOW VOLTAGE PHONE/TV/DATA, | | 8/19/2022 | $50,000 | KIRKLAND | |
PMF22-03563
| Shelter-Lincoln at Moss Bay (Bldg 2)(RE:BNF20-05990) AKA Magnolia Bay at Moss Bay- INSTALL PLUMBING SYSTEMS, PER PLAN. PLUMBING SYSTEMS TO INCLUDE: HOT/COLD DOMESTIC WATER SYSTEMS, SANITARY DRAINAGE AND VENT SYSTEMS, NEW PLUMBING FIXTURES, WATER HEAT | | 7/25/2022 | $20,000 | KIRKLAND | |
PMF22-03407
| MAGNOLIA BLDG. 1 (BMF20-05502) AKA SHELTER-LINCOLN :INSTALL PLUMBING SYSTEM, PER PLAN. PLUMBING SYSTEMS TO INCLUDE: HOT/COLD DOMESTIC WATER SYSTEMS, SANITARY DRAINAGE AND VENT SYSTEMS, NEW PLUMBING FIXTURES, WATER HEATER AND FLOOR DRAINS., | | 7/8/2022 | $20,000 | KIRKLAND | |
PMF22-03376
| MAGNOLIA BLDG. 4 (BMF20-06613) AKA SHELTER-LINCOLN: INSTALL PLUMBING IN MAGNOLIA BLDG. 4, PER PLAN. PLUMBING SYSTEMS TO INCLUDE: HOT/COLD DOMESTIC WATER SYSTEMS, SANITARY DRAINAGE AND VENT SYSTEMS, NEW PLUMBING FIXTURES, WATER HEATER AND FLOOR DRAINS | | 7/8/2022 | $20,000 | KIRKLAND | |
BMF20-06613
| SHELTER-LINCOLN AT MOSS BAY-BLDG. 4 *Sprinklers Required* (UNITS 10, 11, 12) - Construct a three unit (townhouse) structure., | Building, New | 11/30/2021 | $850,000 | KIRKLAND | 8/30/2023 |
BMF20-05502
| SHELTER-LINCOLN at Moss Bay (Bldg 1) Address 501 2nd Ave S A, B C): Construct a 3 unit, 3 story condominium, 3 bedroom, 3 1/2 baths, 2 car garage each unit (multifamily construction) (Re: BMF20-5990, DEM20-03870 & LSM20-04586), | Building, New | 11/30/2021 | $990,720 | KIRKLAND | 8/31/2023 |
BMF20-06527
| SHELTER-LINCOLN at Moss Bay (Bldg 3) - Address 507 2nd Ave S: Construct a 3-unit (Units 7, 8, 9A & 9B) townhouse building, | Building, New | 11/22/2021 | $850,000 | KIRKLAND | 8/30/2023 |
BMF20-05990
| Shelter-Lincoln at Moss Bay (Bldg 2) Address 503 2nd Ave S A, B, C):-Sprinklers Required- 3-Story, 3-Unit Multifamily Building w/2-Car Attached Garage and Rooftop Deck. (Re: BMF20-05502, DEM20-03870 & LSM20-04586), | Building, New | 11/22/2021 | $1,056,600 | KIRKLAND | 8/31/2023 |
DEM20-03870
| Froton Demo: Demolish existing apartment building and carports, | Demolition | 4/21/2021 | $25,000 | KIRKLAND | 7/7/2021 |
|
|
|
|
Reference Links:
Notice mailing date: 09/28/2023
|
|