BNR2025-41501
| E25-53018, (BT307) BT344 EB ST Stride Bus Rapid Transit, The Sound Transit Stride Bus Rapid Transit (BRT) - BT307 Bothell project is part of a new BRT system that will provide fast, frequent and reliable bus service along the SR-522 or NE 145th Stree | Building, New | 5/7/2026 | $437,444 | BOTHELL | |
|
PNR2025-40984
| E25-39997, UWB Husky Village Forest Hall (Bld B), Cafe, Install (1) .5 inch backflow preventer for soda dispensing machine., | | 10/15/2025 | $2,500 | BOTHELL | |
|
PNR2024-38716
| E24-54408 Installation of 3 compartment sink, | | 11/15/2024 | $1,000 | BOTHELL | 9/15/2025 |
|
DET2022-32800
| E22-55781, UW Bothell, Husky Village Redevelopment, Beardslee Blvd. Precast Detention Vault & Structural Calculations, | Remodel | 4/24/2023 | $225,000 | BOTHELL | 9/15/2025 |
|
MNR2023-33410
| E23-01911, UW Bothell Offices Building A1 Upper Level East, Provide and install equipment, and perform misc. duct and GRD mods per drawings., | Other | 3/16/2023 | $85,318 | BOTHELL | 9/15/2025 |
|
MNR2023-33408
| E23-01909, UW Bothell Offices Building A1 Lower Level East, Provide and install equipment, and perform misc. duct and GRD mods per drawings., | Other | 3/16/2023 | $85,318 | BOTHELL | 9/15/2025 |
|
MNR2023-33406
| E23-01907, UW Bothell Offices Building A1 Upper Level West, Provide and install equipment and perform misc. duct and GRD mods per drawings., | Other | 3/9/2023 | $84,937 | BOTHELL | 9/15/2025 |
|
BMU2022-30531
| E22-07217, UW Bothell TI-Office Bldg. A, The work description includes 13,866 sf of type IA construction for a B-Office occupancy. The proposed project includes two floors of office use located in the east wing and one floor on grade located in the | Remodel | 12/29/2022 | $2,709,717 | BOTHELL | 9/15/2025 |
|
BMU2021-28806
| E21-33882, Husky Village Bld B. New 5-story 98 units Dormitory (Group R-2 occupancy) building over a separate 1-story mixed-use building. The ground floor is separated into an east and west wing. The east wing contains residential dormitory (Group R- | Building, New | 12/28/2022 | $12,671,832 | BOTHELL | 9/15/2025 |
|
BMU2021-28783
| E21-33691, Husky Village Bld C, This is a new 5-story residential (Group R-2 occupancy) building over a separate 1-story plus basement business (Group B occupancy) structure. The first floor and basement are Type IA construction and separated from t | Building, New | 12/28/2022 | $14,916,258 | BOTHELL | 9/15/2025 |
|
BMU2022-30544
| E22-07633, UW Bothell TI-Office Bldg. C, The work description includes 5090 sf of type IA construction for a B-Office occupancy. The proposed use will be student administrative office for the University of Washington Bothell., | Remodel | 12/20/2022 | $1,115,791 | BOTHELL | 9/15/2025 |
|
DEM2022-31332
| E22-25459, Husky Village Redevelopment BLDG H Willow Hall, Prior to demolition Operation, Review Safety Plan(s), review JHAs, mobilize equipment and verify MEP cut/cap/make safes are complete. Demolition operations include the following: Demolish exi | Demolition | 6/15/2022 | $0 | BOTHELL | 9/15/2025 |
|
DEM2022-31331
| E22-25458, Husky Village Redevelopment BLDG G Spruce Hall, Prior to demolition Operation, Review Safety Plan(s), review JHAs, mobilize equipment and verify MEP cut/cap/make safes are complete. Demolition operations include the following: Demolish exi | Demolition | 6/15/2022 | $0 | BOTHELL | 9/15/2025 |
|
DEM2022-31330
| E22-25457, Husky Village Redevelopment BLDG C Dogwood Hall, Prior to demolition Operation, Review Safety Plan(s), review JHAs, mobilize equipment and verify MEP cut/cap/make safes are complete. Demolition operations include the following: Demolish ex | Demolition | 6/15/2022 | $0 | BOTHELL | 9/15/2025 |
|
DEM2022-31329
| E22-25455, Husky Village Redevelopment BLDG B Cottonwood Hall, Prior to demolition Operation, Review Safety Plan(s), review JHAs, mobilize equipment and verify MEP cut/cap/make safes are complete. Demolition operations include the following: Demolish | Demolition | 6/15/2022 | $0 | BOTHELL | 9/15/2025 |
|
DEM2022-31328
| E22-25452, Husky Village Redevelopment BLDG A Aspen Hall, Prior to demolition Operation, Review Safety Plan(s), review JHAs, mobilize equipment, and verify MEP cut/cap/make safes are complete. Demolition operations include the following: Demolish ex | Demolition | 6/15/2022 | $0 | BOTHELL | 9/15/2025 |
|
PNR2021-28779
| E21-33604, Plumbing fixtures associated with new Husky Village Bld D, This is a new 2-story Group A-2 Occupancy dining facility building with a full commercial kitchen and Group B Occupancy food services and office support space for staff. The two-s | | 4/12/2022 | $151,965 | BOTHELL | 9/15/2025 |
|
BMU2021-28743
| E21-32618, Husky Village BLD A, This is a new 5-story residential (Group R-2 Occupancy) building over a separate 1-story plus basement business (Group B Occupancy) Structure. The first floor and basement are Type IA construction and separated from t | Building, New | 1/12/2022 | $13,847,326 | BOTHELL | 9/15/2025 |
|
DEM2021-29296
| E21-44587, Husky Village Redevelopment - Demo Building F, Demolition operation including the following: Dust control is ongoing during demolition operations Process demolition debris on site Load demolition debris into 110-yard containers Demolish fo | Demolition | 9/27/2021 | $0 | BOTHELL | 6/29/2022 |
|
DEM2021-29295
| E21-44588, Husky Village Redevelopment - Demo Building E, Demolition operation including the following: Dust control is ongoing during demolition operations Process demolition debris on site Load demolition debris into 110-yard containers Demolish fo | Demolition | 9/27/2021 | $0 | BOTHELL | 6/29/2022 |
|
DEM2021-29294
| E21-44589, Husky Village Redevelopment - Demo Building D, Demolition operation including the following: Dust control is ongoing during demolition operations Process demolition debris on site Load demolition debris into 110-yard containers Demolish fo | Demolition | 9/27/2021 | $0 | BOTHELL | 6/29/2022 |
|
DEM2021-29293
| E21-44590, Husky Village Redevelopment - Demo Club House, Demolition operation including the following: -Dust control is ongoing during demolition operations -Process demolition debris on site -Load demolition debris into 110-yard containers -Demolis | Demolition | 9/27/2021 | $0 | BOTHELL | 6/29/2022 |
|
PNR2020-26846
| E20-47761 1 tankless water heater, other structure,, | | 12/2/2020 | $500 | BOTHELL | 6/29/2022 |
|
PNR2020-26676
| E20-43618, Replace 1 water heater., | | 11/4/2020 | $500 | BOTHELL | 5/17/2021 |
|
PNR2020-26675
| E20-43619, Replace 1 water heater., | | 11/4/2020 | $500 | BOTHELL | 5/17/2021 |
|
PNR2020-24856
| Oak BLD, Husky Village: Repair/replace water main, meter to PRV, PVC with copper. See diagram. Okay for OTC permit by Darin H./ Dave S. Work to be done around March 25, 2020., | | 2/25/2020 | $1,000 | BOTHELL | 5/17/2021 |
|
PNR2020-24683
| E20-04284 Suite 123; 1 hot water heater, | | 2/3/2020 | $800 | BOTHELL | 5/17/2021 |
|
PNR2019-24277
| E19-50935, UW Bothell, Unit 174, (1) hot water heater., | | 12/9/2019 | $1,000 | BOTHELL | 4/30/2020 |
|
PNR2019-23498
| E19-36514; Unit 121; 1 hot water heater, | | 9/3/2019 | $800 | BOTHELL | 4/30/2020 |
|
PNR2019-23497
| E19-36515; Unit 271; 1 hot water heater, | | 9/3/2019 | $800 | BOTHELL | 4/30/2020 |
|
BMF2018-20056
| E18-24213 Repair water damaged siding and wood studs on exterior wall and re-fortify stairwell., | Remodel | 8/24/2018 | $20,000 | BOTHELL | 6/21/2019 |
|
PNR2017-16765
| E17-23135 Replacement of water heater, apt 111, | | 8/5/2018 | $0 | BOTHELL | 6/21/2019 |
|
BNR2017-16923
| E17-24946: THIS IS AN EMERGENCY REPAIR. Repair damaged exterior siding and beams at Cottonwood. Separate permit submitted for Dogwood (BNR2017-17023), | Remodel | 9/5/2017 | $50,000 | BOTHELL | 3/2/2018 |
|
BNR2017-15439
| E17-08275, uw bothell husky village willow and spruce halls, Apt, 174, 182, UPDATE 3 GROUND FLOOR UNITS TO ADA STANDARDS OUTLINED IN ICC A117.1 2009 INCREASING ADA COMPLIANT UNITS IN WILLOW AND SPRUCE HALLS FROM4% TO 16%., | Remodel | 6/23/2017 | $300,000 | BOTHELL | 3/2/2018 |
|
PNR2016-12224
| E16-04122 Nonresidential replacement of electric water heater; Husky Village Apt 351, | | 2/17/2016 | $0 | BOTHELL | 3/2/2018 |
|
PNR2016-12094
| E16-02505 replace water heater electric apt 252, | | 1/29/2016 | $0 | BOTHELL | 3/2/2018 |
|
BMF2014-06858
| Carport 10 of 16. Partial demolition of carport structure. Structure that holds lighting will remain in place., | Remodel | 2/24/2014 | $900 | BOTHELL | 3/2/2018 |
|
BMF2014-06864
| Carport 16 of 16. Partial demolition of carport structure. Structure that holds lighting will remain in place., | Remodel | 2/24/2014 | $1,050 | BOTHELL | 3/2/2018 |
|
BMF2014-06863
| Carport 15 of 16. Partial demolition of carport structure. Structure that holds lighting will remain in place., | Remodel | 2/24/2014 | $900 | BOTHELL | 3/2/2018 |
|
BMF2014-06862
| Carport 14 of 16. Partial demolition of carport structure. Structure that holds lighting will remain in place., | Remodel | 2/24/2014 | $900 | BOTHELL | 3/2/2018 |
|
BMF2014-06861
| Carport 13 of 16. Partial demolition of carport structure. Structure that holds lighting will remain in place., | Remodel | 2/24/2014 | $600 | BOTHELL | 3/2/2018 |
|
BMF2014-06860
| Carport 12 of 16. Partial demolition of carport structure. Structure that holds lighting will remain in place., | Remodel | 2/24/2014 | $900 | BOTHELL | 3/2/2018 |
|
BMF2014-06859
| Carport 11 of 16. Partial demolition of carport structure. Structure that holds lighting will remain in place., | Remodel | 2/24/2014 | $900 | BOTHELL | 3/2/2018 |
|
BMF2014-06857
| Carport 9 of 16. Partial demolition of carport structure. Structure that holds lighting will remain in place., | Remodel | 2/24/2014 | $600 | BOTHELL | 3/2/2018 |
|
BMF2014-06856
| Carport 8 of 16. Partial demolition of carport structure. Structure that holds lighting will remain in place., | Remodel | 2/24/2014 | $600 | BOTHELL | 3/2/2018 |
|
BMF2014-06855
| Carport 7 of 16. Partial demolition of carport structure. Structure that holds lighting will remain in place., | Remodel | 2/24/2014 | $600 | BOTHELL | 3/2/2018 |
|
BMF2014-06854
| Carport 6 of 16. Partial demolition of carport structure. Structure that holds lighting will remain in place., | Remodel | 2/24/2014 | $600 | BOTHELL | 3/2/2018 |
|
BMF2014-06853
| Carport 5 of 16. Partial demolition of carport structure. Structure that holds lighting will remain in place., | Remodel | 2/24/2014 | $600 | BOTHELL | 3/2/2018 |
|
BMF2014-06852
| Carport 4 of 16. Partial demolition of carport structure. Structure that holds lighting will remain in place., | Remodel | 2/24/2014 | $450 | BOTHELL | 3/2/2018 |
|
BMF2014-06851
| Carport 3 of 16. Partial demolition of carport structure. Structure that holds lighting will remain in place., | Remodel | 2/24/2014 | $450 | BOTHELL | 3/2/2018 |
|
BMF2014-06850
| Carport 2 of 16. Partial demolition of carport structure. Structure that holds lighting will remain in place., | Remodel | 2/24/2014 | $1,200 | BOTHELL | 3/2/2018 |
|
BMF2014-06849
| Carport 1 of 16. Partial demolition of carport structure. Structure that holds lighting will remain in place., | Remodel | 2/24/2014 | $900 | BOTHELL | 3/2/2018 |
|
MMF2013-05748
| Discontinue use of existing fireplaces, cap chimney., | Other | 9/17/2013 | $0 | BOTHELL | 3/2/2018 |
|
MMF2013-05747
| Discontinue use of existing fireplaces, cap chimney., | Other | 9/17/2013 | $0 | BOTHELL | 3/2/2018 |
|
MMF2013-05746
| Discontinue use of existing fireplaces, cap chimney., | Other | 9/17/2013 | $0 | BOTHELL | 3/2/2018 |
|
MMF2013-05745
| Discontinue use of existing fireplaces, cap chimney., | Other | 9/17/2013 | $0 | BOTHELL | 3/2/2018 |
|
MMF2013-05744
| Discontinue use of existing fireplaces, cap chimney., | Other | 9/17/2013 | $0 | BOTHELL | 3/2/2018 |
|
MMF2013-05743
| Discontinue use of existing fireplaces, cap chimney., | Other | 9/17/2013 | $0 | BOTHELL | 3/2/2018 |
|
MMF2013-05742
| Discontinue use of existing fireplaces, cap chimney., | Other | 9/17/2013 | $0 | BOTHELL | 3/2/2018 |
|
MMF2013-05741
| Discontinue use of existing fireplaces, cap chimney., | Other | 9/17/2013 | $0 | BOTHELL | 3/2/2018 |
|
PMF2013-05474
| Like for like replacement of electric water heater, | | 7/10/2013 | $0 | BOTHELL | 3/2/2018 |
|
PMF2013-04887
| Replacement of electric water heater in unit 151, Oak Hall., | | 5/8/2013 | $0 | BOTHELL | 3/2/2018 |
|
PMF2013-03840
| Willow Hall. Replacement of electric water heater., | | 1/23/2013 | $0 | BOTHELL | 3/2/2018 |
|
BNR2011-00606
| Addition of 463 sq ft and renovate existing interior space of community center bldg. Enclose existing covered entry, existing mail alcove & spa area. Adding 10' X 16' office space. | Remodel | 12/6/2011 | $150,000 | BOTHELL | 8/27/2013 |