| Parcel | 094200-0640 |
| Name | GC COLUMBIA LLC |
| Site Address | 411 COLUMBIA ST 98104 |
| Geo Area |
30-40
|
| Spec Area |
280-120
|
| Property Name | COLUMBIA CENTER ( former B. of A. Tower) |
|
| Jurisdiction | SEATTLE |
| Levy Code | 0011 |
| Property Type |
C
|
| Plat Block / Building Number | 28 |
| Plat Lot / Unit Number | 1 THRU 8 |
| Quarter-Section-Township-Range |
SW-32-25-4
|
|
|
|
| Highest & Best Use As If Vacant | COMMERCIAL SERVICE |
| Highest & Best Use As Improved | PRESENT USE |
| Present Use | Office Building |
| Land SqFt | 59,266 |
| Acres | 1.36 |
|
| Percentage Unusable | |
| Unbuildable | NO |
| Restrictive Size Shape | NO |
| Zoning | DOC1 U/450/U |
| Water | WATER DISTRICT |
| Sewer/Septic | PUBLIC |
| Road Access | PUBLIC |
| Parking | ADEQUATE |
| Street Surface | PAVED |
|
|
Views |
Waterfront |
| Rainier | |
| Territorial | |
| Olympics | |
| Cascades | |
| Seattle Skyline | |
| Puget Sound | |
| Lake Washington | |
| Lake Sammamish | |
| Lake/River/Creek | |
| Other View | |
|
| Waterfront Location | |
| Waterfront Footage | 0 |
| Lot Depth Factor | 0 |
| Waterfront Bank | |
| Tide/Shore | |
| Waterfront Restricted Access | |
| Waterfront Access Rights | NO |
| Poor Quality | NO |
| Proximity Influence | NO |
|
|
Designations |
Nuisances |
| Historic Site | |
| Current Use | (none) |
| Nbr Bldg Sites | |
| Adjacent to Golf Fairway | NO |
| Adjacent to Greenbelt | NO |
| Other Designation | NO |
| Deed Restrictions | NO |
| Development Rights Purchased | NO |
| Easements | NO |
| Native Growth Protection Easement | NO |
| DNR Lease | NO |
|
| Topography | |
| Traffic Noise | |
| Airport Noise | |
| Power Lines | NO |
| Other Nuisances | NO |
|
|
Problems |
| Water Problems | NO |
| Transportation Concurrency | NO |
| Other Problems | NO |
|
|
Environmental |
|
Section(s) Of Building Number:
1
|
3
| UNDERGROUND PARKING STRUCTURE (388) | 764 | 6 | 11 | | 319,400 | 0 |
|
1
| OFFICE BUILDING (344) | | 72 | 11 | | 1,577,300 | 1,471,101 |
|
2
| RETAIL STORE (353) | | 4 | 11 | | 55,520 | 55,520 |
|
| 094200064007 | 2026 | 2027 | | 0011 | 35,559,600 | 311,430,400 | 346,990,000 | 0 | 35,559,600 | 311,430,400 | 346,990,000 | |
| 094200064007 | 2025 | 2026 | | 0011 | 94,825,600 | 282,630,400 | 377,456,000 | 0 | 94,825,600 | 282,630,400 | 377,456,000 | |
| 094200064007 | 2024 | 2025 | | 0011 | 94,825,600 | 369,039,400 | 463,865,000 | 0 | 94,825,600 | 369,039,400 | 463,865,000 | |
| 094200064007 | 2023 | 2024 | | 0011 | 94,825,600 | 557,994,400 | 652,820,000 | 0 | 94,825,600 | 557,994,400 | 652,820,000 | |
| 094200064007 | 2022 | 2023 | | 0011 | 91,862,300 | 674,372,700 | 766,235,000 | 0 | 91,862,300 | 674,372,700 | 766,235,000 | |
| 094200064007 | 2021 | 2022 | | 0011 | 91,862,300 | 693,137,700 | 785,000,000 | 0 | 91,862,300 | 693,137,700 | 785,000,000 | |
| 094200064007 | 2020 | 2021 | | 0011 | 91,862,300 | 759,057,700 | 850,920,000 | 0 | 91,862,300 | 759,057,700 | 850,920,000 | |
| 094200064007 | 2019 | 2020 | | 0011 | 77,045,800 | 780,334,200 | 857,380,000 | 0 | 77,045,800 | 780,334,200 | 857,380,000 | |
| 094200064007 | 2018 | 2019 | | 0011 | 71,119,200 | 725,455,800 | 796,575,000 | 0 | 71,119,200 | 725,455,800 | 796,575,000 | |
| 094200064007 | 2017 | 2018 | | 0011 | 65,192,600 | 613,191,400 | 678,384,000 | 0 | 65,192,600 | 613,191,400 | 678,384,000 | |
| 094200064007 | 2016 | 2017 | | 0012 | 53,339,400 | 556,451,600 | 609,791,000 | 0 | 53,339,400 | 556,451,600 | 609,791,000 | |
| 094200064007 | 2015 | 2016 | | 0012 | 45,931,100 | 484,786,900 | 530,718,000 | 0 | 45,931,100 | 484,786,900 | 530,718,000 | |
| 094200064007 | 2014 | 2015 | | 0012 | 44,449,500 | 293,020,500 | 337,470,000 | 0 | 44,449,500 | 293,020,500 | 337,470,000 | |
| 094200064007 | 2013 | 2014 | | 0010 | 41,486,200 | 268,909,800 | 310,396,000 | 0 | 41,486,200 | 268,909,800 | 310,396,000 | |
| 094200064007 | 2012 | 2013 | | 0010 | 35,559,600 | 241,812,400 | 277,372,000 | 0 | 35,559,600 | 241,812,400 | 277,372,000 | |
| 094200064007 | 2011 | 2012 | | 0010 | 35,559,600 | 239,524,400 | 275,084,000 | 0 | 35,559,600 | 239,524,400 | 275,084,000 | |
| 094200064007 | 2010 | 2011 | | 0010 | 35,559,600 | 260,404,400 | 295,964,000 | 0 | 35,559,600 | 260,404,400 | 295,964,000 | |
| 094200064007 | 2009 | 2010 | | 0010 | 35,559,600 | 344,510,400 | 380,070,000 | 0 | 35,559,600 | 344,510,400 | 380,070,000 | |
| 094200064007 | 2008 | 2009 | | 0010 | 35,559,600 | 474,315,400 | 509,875,000 | 0 | 35,559,600 | 474,315,400 | 509,875,000 | |
| 094200064007 | 2007 | 2008 | | 0010 | 31,114,600 | 398,368,000 | 429,482,600 | 0 | 31,114,600 | 398,368,000 | 429,482,600 | |
| 094200064007 | 2006 | 2007 | | 0010 | 22,224,700 | 329,256,100 | 351,480,800 | 0 | 22,224,700 | 329,256,100 | 351,480,800 | |
| 094200064007 | 2005 | 2006 | | 0010 | 17,839,000 | 273,033,300 | 290,872,300 | 0 | 17,839,000 | 273,033,300 | 290,872,300 | |
| 094200064007 | 2004 | 2005 | | 0010 | 17,839,000 | 274,516,000 | 292,355,000 | 0 | 17,839,000 | 274,516,000 | 292,355,000 | |
| 094200064007 | 2003 | 2004 | | 0010 | 17,839,000 | 266,395,000 | 284,234,000 | 0 | 17,839,000 | 266,395,000 | 284,234,000 | |
| 094200064007 | 2002 | 2003 | | 0010 | 17,839,000 | 292,282,000 | 310,121,000 | 0 | 17,839,000 | 292,282,000 | 310,121,000 | |
| 094200064007 | 2001 | 2002 | | 0010 | 17,779,800 | 349,220,200 | 367,000,000 | 0 | 17,779,800 | 349,220,200 | 367,000,000 | |
| 094200064007 | 2000 | 2001 | | 0010 | 14,816,500 | 373,759,500 | 388,576,000 | 0 | 14,816,500 | 373,759,500 | 388,576,000 | |
| 094200064007 | 1999 | 2000 | | 0010 | 14,816,500 | 341,271,500 | 356,088,000 | 0 | 14,816,500 | 341,271,500 | 356,088,000 | |
| 094200064007 | 1998 | 1999 | | 0010 | 14,067,500 | 274,308,500 | 288,376,000 | 0 | 14,067,500 | 274,308,500 | 288,376,000 | |
| 094200064007 | 1997 | 1998 | | 0010 | 0 | 0 | 0 | 0 | 6,659,000 | 201,058,300 | 207,717,300 | |
| 094200064007 | 1996 | 1997 | | 0010 | 0 | 0 | 0 | 0 | 6,659,000 | 185,341,000 | 192,000,000 | |
| 094200064007 | 1995 | 1996 | | 0010 | 0 | 0 | 0 | 0 | 11,985,750 | 183,014,250 | 195,000,000 | |
|
|
2748359
|
20150807001301
|
8/6/2015
| $711,013,000.00 | COLUMBIA CENTER PROPERTY LLC | GC COLUMBIA LLC | Special Warranty Deed | None |
|
2279586
|
20070424000113
|
4/10/2007
| $621,000,000.00 | WA-COLUMBIA CENTER LLC | COLUMBIA CENTER PROPERTY LLC | Special Warranty Deed | None |
|
1621309
|
199806261555
|
6/26/1998
| $53,800,000.00 | SEAFIRST CENTER | EOP-COLUMBIA CENTER LLC | DEED | None |
|
1621308
|
000000000000
|
6/26/1998
| $50,000,000.00 | SEAFIRST CENTER | EOP-COLUMBIA CENTER LLC | DEED | None |
|
1621307
|
000000000000
|
6/26/1998
| $50,000,000.00 | SEAFIRST CENTER | EOP-COLUMBIA CENTER LLC | DEED | None |
|
1621306
|
000000000000
|
6/26/1998
| $50,000,000.00 | SEAFIRST CENTER | EOP-COLUMBIA CENTER LLC | DEED | None |
|
1621305
|
000000000000
|
6/26/1998
| $50,000,000.00 | SEAFIRST CENTER | EOP-COLUMBIA CENTER LLC | DEED | None |
|
1621304
|
000000000000
|
6/26/1998
| $50,000,000.00 | SEAFIRST CENTER | EOP-COLUMBIA CENTER LLC | DEED | None |
|
1621303
|
000000000000
|
6/26/1998
| $50,000,000.00 | SEAFIRST CENTER | EOP-COLUMBIA CENTER LLC | DEED | None |
|
1621302
|
000000000000
|
6/26/1998
| $50,000,000.00 | SEAFIRST CENTER | EOP-COLUMBIA CENTER LLC | DEED | None |
|
| 2026 | 2505481 | Local Appeal | $377,456,000 | 7/1/2026 | $377,456,000 | SUSTAIN | Completed |
| 2025 | 2403037 | Local Appeal | $463,865,000 | 11/24/2025 | $463,865,000 | SUSTAIN | Completed |
| 2025 | 105963 | State Appeal | $463,865,000 | 1/1/1900 | $0 | | Active |
| 2024 | 2303832 | Local Appeal | $652,820,000 | 12/3/2024 | $652,820,000 | SUSTAIN | Completed |
| 2024 | 104502 | State Appeal | $652,820,000 | 1/1/1900 | $0 | DISMISS | Completed |
| 2023 | 2204214 | Local Appeal | $766,235,000 | 8/9/2023 | $766,235,000 | SUSTAIN | Completed |
| 2022 | 2102676 | Local Appeal | $818,914,000 | 3/28/2022 | $785,000,000 | REVISE | Completed |
| 2021 | 99267 | State Appeal | $850,920,000 | 1/1/1900 | $0 | DISMISS | Completed |
| 2021 | 2003833 | Local Appeal | $850,920,000 | 7/13/2021 | $850,920,000 | SUSTAIN | Completed |
| 2020 | 97787 | State Appeal | $857,380,000 | 9/28/2021 | $857,380,000 | SUSTAIN | Completed |
| 2020 | 1901798 | Local Appeal | $857,380,000 | 9/9/2020 | $857,380,000 | SUSTAIN | Completed |
| 2019 | 96084 | State Appeal | $796,575,000 | 9/28/2021 | $796,575,000 | SUSTAIN | Completed |
| 2019 | 1803692 | Local Appeal | $796,575,000 | 6/19/2019 | $796,575,000 | SUSTAIN | Completed |
| 2013 | 1201813 | Local Appeal | $277,372,000 | 4/29/2013 | $277,372,000 | SUSTAIN | Completed |
| 2012 | 82605 | State Appeal | $275,084,000 | 9/22/2015 | $275,084,000 | SUSTAIN | Completed |
| 2012 | 1103808 | Local Appeal | $275,084,000 | 8/16/2012 | $275,084,000 | SUSTAIN | Completed |
| 2011 | 1004757 | Local Appeal | $295,964,000 | 2/6/2012 | $295,964,000 | SUSTAIN | Completed |
| 2010 | 76581 | State Appeal | $380,070,000 | 5/30/2012 | $380,070,000 | SUSTAIN | Completed |
| 2010 | 0907604 | Local Appeal | $380,070,000 | 1/24/2011 | $380,070,000 | SUSTAIN | Completed |
| 2009 | 71216 | State Appeal | $509,875,000 | 8/30/2010 | $509,875,000 | SUSTAIN | Completed |
| 2009 | 0804686 | Local Appeal | $513,360,000 | 7/16/2009 | $509,875,000 | REVISE, ASSESSOR RECOMMENDED | Completed |
| 2008 | 0701309 | Local Appeal | $429,482,600 | 1/1/1900 | $0 | | Completed |
| 2007 | 65897 | State Appeal | $351,480,800 | 12/20/2007 | $351,480,800 | SUSTAIN | Completed |
| 2007 | 0601376 | Local Appeal | $351,480,800 | 4/3/2007 | $351,480,800 | SUSTAIN | Completed |
| 2005 | 0403844 | Local Appeal | $292,355,000 | 5/31/2005 | $292,355,000 | SUSTAIN | Completed |
| 2004 | 0305039 | Local Appeal | $301,507,000 | 1/1/1900 | $0 | | Completed |
| 2002 | 0105490 | Local Appeal | $388,897,000 | 1/1/1900 | $0 | | Completed |
| 1993 | 9204490 | Local Appeal | $275,000,000 | 11/4/1992 | $264,799,600 | REVISE | Completed |
| 1992 | 9101349 | Local Appeal | $331,000,000 | 3/4/1992 | $284,134,900 | REVISE | Completed |
| 1991 | 9013288 | Local Appeal | $331,000,000 | 4/15/1991 | $331,000,000 | SUSTAIN | Completed |
| 1990 | 8901194 | Local Appeal | $195,912,000 | 12/11/1989 | $195,912,000 | SUSTAIN | Completed |
| 1989 | 8808103 | Local Appeal | $182,692,000 | 12/11/1989 | $182,692,000 | SUSTAIN | Completed |
| 1986 | 8501688 | Local Appeal | $175,600,000 | 2/5/1986 | $142,492,200 | REVISE | Completed |
|
|
7145753-CN
| Construct interior alterations to existing tenant space, subject to field inspection, STFI., | Remodel | 6/3/2026 | $22,500 | SEATTLE | 8/18/2026 |
|
7130812-BK
| Construct blanket permit tenant improvements to Davis Grimm on the 35th floor of existing commercial building, per plan., | Remodel | 3/17/2026 | $0 | SEATTLE | 8/18/2026 |
|
7120837-CN
| Construct interior non-structural tenant improvements (Freestone Capitol Mgmt.) on Floor 74 of Columbia Center, subject to field inspection (STFI)., | Remodel | 12/11/2025 | $308,693 | SEATTLE | 8/18/2026 |
|
7105101-BK
| Construct blanket permit tenant improvements to Seed IP Law Group on the 53rd and 54th floors of existing commercial building, per plan., | Remodel | 9/22/2025 | $0 | SEATTLE | 8/18/2026 |
|
7096875-BK
| Construct blanket permit tenant improvements to Ogden Murphy Wallace on the 58th floor of existing commercial building, per plan., | Remodel | 8/7/2025 | $0 | SEATTLE | 8/18/2026 |
|
7082292-BK
| Construct blanket permit tenant improvements to Carta on the 25th floor of existing commercial building, per plan., | Remodel | 5/12/2025 | $0 | SEATTLE | 9/10/2025 |
|
7065778-CN
| Tenant improvement in existing commercial building (Columbia Center) on the 72nd floor, occupy per plan, | Remodel | 3/27/2025 | $1,180,059 | SEATTLE | 9/10/2025 |
|
7075107-EL
| Data cabling for 47th floor of Columbia Tower Center, | | 3/12/2025 | $101,000 | SEATTLE | 9/10/2025 |
|
7057808-BK
| Construct blanket permit tenant improvements to Unispace on the 67th floor of existing commercial building, per plan., | Remodel | 1/13/2025 | $0 | SEATTLE | 9/10/2025 |
|
7013318-BK
| Construct blanket permit tenant improvements for VALOR EQUITY PARTNERS in Suite 7100 of existing commercial building, per plan., | Remodel | 4/2/2024 | $0 | SEATTLE | 8/23/2024 |
|
6925922-BK
| Construct blanket permit tenant improvements to future tenant on floors: 21, 28, 34, and 71 of existing commercial building, per plan., | Remodel | 11/21/2022 | $0 | SEATTLE | 8/23/2024 |
|
6903844-CN
| Construct structural repairs to commercial high-rise at south portion of 3rd floor, per plan., | Remodel | 9/20/2022 | $0 | SEATTLE | 8/23/2024 |
|
6912466-BK
| Construct blanket permit tenant improvements to future tenant floor 67 of existing commercial building, per plan., | Remodel | 8/5/2022 | $0 | SEATTLE | 8/23/2024 |
|
6904951-BK
| Construct blanket permit tenant improvements for King County Prosecuting Attorney on Floors 5 and 6 of existing commercial building, per plan., | Remodel | 7/15/2022 | $0 | SEATTLE | 8/23/2024 |
|
6893991-CN
| Tenant improvement on floor 66 of existing commercial building, subject to field inspection (STFI), | Remodel | 4/25/2022 | $200,000 | SEATTLE | 8/23/2024 |
|
6845977-CN
| Non-structural alterations to Cherry Street and Columbia Street garage entrances, subject to field inspection (STFI), | Remodel | 6/29/2021 | $68,000 | SEATTLE | 8/23/2024 |
|
6821737-CN
| Construct tenant improvements in existing commercial building on the 65th Floor, per plan., | Remodel | 4/20/2021 | $250,000 | SEATTLE | 8/23/2024 |
|
6817607-BK
| Blanket permit tenant improvements to office space for GSA SSA on the 9th floor, per plans., | Remodel | 1/26/2021 | $0 | SEATTLE | 8/23/2024 |
|
6804357-BK
| Blanket permit tenant improvements to office space for vacant suite on the 9th floor, per plans., | Remodel | 1/14/2021 | $0 | SEATTLE | 8/23/2024 |
|
6792941-CN
| Tenant improvements for commercial building on the 12th floor suite 1220, per plans., | Remodel | 10/2/2020 | $192,000 | SEATTLE | 8/12/2021 |
|
6714583-CN
| Tenant improvements including new assembly areas in a commercial building for offices on the 40th floor, occupy per plan., | Remodel | 12/20/2019 | $200,000 | SEATTLE | 8/23/2024 |
|
6762151-CN
| Construct interior alterations for tenant improvement to existing restaurant space, Subject to Field Inspection (STFI), | Remodel | 12/10/2019 | $25,000 | SEATTLE | 8/23/2024 |
|
6735011-CN
| Construct tenant improvements and convenience stair at floors 12 & 13, occupy per plan., | Remodel | 12/5/2019 | $307,250 | SEATTLE | 9/11/2020 |
|
6655626-CN
| Change of use from medical office to food service and construct alterations in suite 212 of Columbia Center for same, per plans, | Remodel | 12/6/2018 | $140,000 | SEATTLE | 8/23/2024 |
|
6669533-CN
| Construct tenant improvements to expand existing gym in commercial building, occupy per plan., | Remodel | 10/23/2018 | $200,000 | SEATTLE | 8/23/2024 |
|
6680696-CN
| Tenant improvements to 65th floor offices, conference rooms and break room and occupy, per plans., | Remodel | 10/15/2018 | $250,000 | SEATTLE | 8/23/2024 |
|
6655926
| Blanket Permit for interior non-structural alterations for DORSEY & WHITNEY, per plan., | Remodel | 4/26/2018 | $4,980,510 | SEATTLE | 8/23/2024 |
|
6652762
| Blanket Permit for interior non-structural alterations. Tenant improvement on the 72nd floor for Grab Inc", | Remodel | 4/4/2018 | $400,000 | SEATTLE | 8/23/2024 |
|
6651176
| Construct tenant improvement for Sky view observation caf├® renovation, per plan, | Remodel | 3/19/2018 | $150,000 | SEATTLE | 8/23/2024 |
|
6622280
| Blanket Permit for interior non-structural alterations. Interior buildout. Floor 70, | Remodel | 11/17/2017 | $900,000 | SEATTLE | 8/23/2024 |
|
6622061
| Blanket Permit for interior non-structural alterations. Tenant Improvement floor 69., | Remodel | 11/17/2017 | $900,000 | SEATTLE | 8/23/2024 |
|
6626934
| Blanket Permit for interior non-structural alterations on floors 53 and 54 for The Seed IP Law Group, per plan., | Remodel | 11/7/2017 | $1,000,000 | SEATTLE | 8/23/2024 |
|
6626685
| Interior alterations to 57th floor of existing tenant space, subject to field inspection (STFI, | Remodel | 10/31/2017 | $90,000 | SEATTLE | 8/23/2024 |
|
6622907
| Blanket Permit for interior non-structural alterations. Tenant improvement on the 50th floor for "Wilson, Sonsini, Goodrich & Rpsati (WSGR), | Remodel | 10/15/2017 | $205,864 | SEATTLE | 8/23/2024 |
|
6619698
| Blanket Permit for interior non-structural alterations, per plan., | Remodel | 9/21/2017 | $400,000 | SEATTLE | 8/23/2024 |
|
6616666
| Blanket Permit for interior non-structural alterations. Tenant improvement flr.50 for Seed Law, per plan., | Remodel | 9/8/2017 | $400,000 | SEATTLE | 8/23/2024 |
|
6616755
| Construct alterations in room 1220 of an existing commercial building (Columbia Center) subject to field inspection (STFI), | Remodel | 9/1/2017 | $90,000 | SEATTLE | 8/23/2024 |
|
6613305
| Interior Alterations to suite 4300 in existing office building, subject to field inspection (STFI)., | Remodel | 8/14/2017 | $200,000 | SEATTLE | 8/23/2024 |
|
6609385
| Blanket Permit for interior non-structural alterations. Core PT Relocation, floor 21, suite 2160 for CORE PT., | Remodel | 8/5/2017 | $140,000 | SEATTLE | 8/23/2024 |
|
6582494
| Tenant improvements to existing restaurant (Starbucks) on 40th floor, per plans., | Remodel | 7/13/2017 | $162,000 | SEATTLE | 8/23/2024 |
|
6596716
| Blanket Permit for interior non-structural alterations. Tenant improvements on the 25th and 68th floors of Columbia Center for common area upgrades, per plan., | Remodel | 6/26/2017 | $150,000 | SEATTLE | 8/23/2024 |
|
6595701
| Blanket Permit for interior non-structural alterations. Tenant improvement on 23rd floor for "98point6", per plan., | Remodel | 5/16/2017 | $1,200,000 | SEATTLE | 8/23/2024 |
|
6573364
| Tenant improvements to existing restaurant and construct outdoor dining patio for Starbucks, per plans. Project includes mechanical review, | Remodel | 5/12/2017 | $375,000 | SEATTLE | 8/23/2024 |
|
6586344
| Blanket Permit for interior non-structural alterations. Vacant Suite Prep, | Remodel | 3/31/2017 | $500,000 | SEATTLE | 8/23/2024 |
|
6558451
| Alterations to levels 1-4 of existing office building, per plans. Project includes mechanical review., | Remodel | 3/8/2017 | $9,552,000 | SEATTLE | 8/23/2024 |
|
6538947
| Alterations to exterior plaza and interior public spaces of 4th level of existing commercial building, per plan., | Remodel | 3/3/2017 | $1,150,000 | SEATTLE | 8/23/2024 |
|
6566078
| Blanket Permit for interior non-structural alterations. Tenant improvement for the 68th floor of Pacific Portfolio, per plans., | Remodel | 12/13/2016 | $600,000 | SEATTLE | 8/23/2024 |
|
6567806
| Blanket Permit for interior non-structural alterations for the 73rd floor., | Remodel | 12/2/2016 | $220,000 | SEATTLE | 8/23/2024 |
|
6567965
| Interior alterations to existing commercial building (Suite 6700), subject to field inspection (STFI)., | Remodel | 11/18/2016 | $150,000 | SEATTLE | 8/23/2024 |
|
6560320
| Blanket Permit for interior non-structural alterations. for Peach on 2nd and 3rd floor, | Remodel | 10/25/2016 | $120,000 | SEATTLE | 8/23/2024 |
|
6559551
| Blanket Permit for interior non-structural alterations to the 72nd floor. For IO ACTIVE, per plan., | Remodel | 10/25/2016 | $120,000 | SEATTLE | 8/23/2024 |
|
6557354
| Tenant improvement on the 7th floor of existing commercial building Subject To Field Inspection STFI, | Remodel | 10/20/2016 | $302,509 | SEATTLE | 8/23/2024 |
|
6556753
| Blanket Permit for interior non-structural alterations for 47th floor., | Remodel | 10/5/2016 | $70,000 | SEATTLE | 8/23/2024 |
|
6556343
| Interior alterations to existing commercial building (4th floor Suite 400b), subject to field inspection (STFI)., | Remodel | 9/13/2016 | $100,000 | SEATTLE | 8/23/2024 |
|
6556338
| Interior alterations to existing commercial building (4th floor Suite 400b), subject to field inspection (STFI)., | Remodel | 9/13/2016 | $75,000 | SEATTLE | 8/23/2024 |
|
6549806
| Construct interior alterations in suite 3400 of an existing office subject to field inspection (STFI), | Remodel | 8/4/2016 | $50,000 | SEATTLE | 8/23/2024 |
|
6544899
| Blanket Permit for interior non-structural alterations for tenant, INNOVATION X. FLOOR 46, per plans., | Remodel | 7/29/2016 | $350,000 | SEATTLE | 8/23/2024 |
|
6531356
| Change occupancy in existing commercial building space on floor 63, occupy per plan., | Remodel | 7/10/2016 | $100,000 | SEATTLE | 8/23/2024 |
|
6526306
| Blanket Permit tenant improvement for interior non-structural alterations for Dropbox on the 63 floor, per plan., | Remodel | 4/25/2016 | $1,200,000 | SEATTLE | 8/23/2024 |
|
6513258
| Blanket Permit for interior non-structural alterationsto the 35th floor. For (SSA Office), per plans., | Remodel | 3/17/2016 | $140,000 | SEATTLE | 8/23/2024 |
|
6520855
| Interior alterations to existing caf├®, subject to field inspection (STFI)., | Remodel | 2/25/2016 | $65,000 | SEATTLE | 8/23/2024 |
|
6510374
| Blanket Permit for interior non-structural alterations. Tenant improvements on 46th floor (Ridgway Law Group)., | Remodel | 12/31/2015 | $150,000 | SEATTLE | 8/23/2024 |
|
6509180
| Blanket Permit for interior non-structural alterations. Tenant improvement to floors 2, 3, 6, 41, 43, 45-48, 58, 66 and 72 for "VSP's 1016, | Remodel | 12/30/2015 | $350,000 | SEATTLE | 8/23/2024 |
|
6496028
| Blanket Permit for interior non-structural alterations to floor 51 & 52. For WILSON SONSINI EXPANSION, per plans., | Remodel | 10/16/2015 | $308,047 | SEATTLE | 8/23/2024 |
|
6495493
| Blanket Permit for interior non-structural alterations for tenant, Mcullough Expansion. Floor 66, | Remodel | 9/25/2015 | $91,984 | SEATTLE | 8/23/2024 |
|
6494144
| Blanket Permit for interior non-structural alterations. Floor 47. Fain Anderson Vanderhoeff, Rosendahl, Ohalloran, Spillane, | Remodel | 9/25/2015 | $394,600 | SEATTLE | 8/23/2024 |
|
6492653
| Blanket Permit for interior non-structural alterations for 27th floor., | Remodel | 9/11/2015 | $819,721 | SEATTLE | 8/23/2024 |
|
6490344
| Blanket Permit for interior non-structural alterations to the 37th floor. For GAO OFFICE, per plans., | Remodel | 9/11/2015 | $800,851 | SEATTLE | 8/23/2024 |
|
6487349
| Construct tenant improvements to existing commercial building at the south end of the 3rd floor subject to field inspection (STFI), | Remodel | 8/11/2015 | $200,000 | SEATTLE | 8/23/2024 |
|
6480309
| Blanket Permit for interior non-structural alterations to 52nd floor, | Remodel | 7/10/2015 | $292,635 | SEATTLE | 8/23/2024 |
|
6477358
| Blanket Permit for interior non-structural alterations on 37th floor general accountability office, | Remodel | 6/23/2015 | $221,945 | SEATTLE | 8/23/2024 |
|
6477354
| Blanket Permit for interior non-structural alterations ON THE 68TH FLOOR, | Remodel | 6/23/2015 | $250,000 | SEATTLE | 8/23/2024 |
|
6462609
| Blanket Permit for non-structural interior tenant improvement on 25th floor of "Ticor Title, | Remodel | 6/23/2015 | $157,400 | SEATTLE | 8/23/2024 |
|
6477341
| Construct tenants improvements to suite 7121 per floor plan subject to field inspection, | Remodel | 6/3/2015 | $65,000 | SEATTLE | 8/23/2024 |
|
6474397
| Blanket Permit for interior non-structural alterations to the 21st floor Gordon & Rees) per plan., | Remodel | 6/2/2015 | $125,000 | SEATTLE | 8/23/2024 |
|
6471230
| Blanket Permit for interior non-structural alterations for the 22nd and 24th floor, per plan., | Remodel | 5/12/2015 | $250,000 | SEATTLE | 8/23/2024 |
|
6460075
| Construct alterations to offices at 76th floor in existing commercial building, per floor plan, subject to field inspection., | Remodel | 5/7/2015 | $95,000 | SEATTLE | 8/23/2024 |
|
6464669
| Blanket Permit for interior non-structural alterations to Floor 63 and 64 (Drop Box TI), per plan, | Remodel | 4/6/2015 | $226,445 | SEATTLE | 8/23/2024 |
|
6464670
| Blanket Permit for interior non-structural alterations to Floors 35 and 36 Carney Badley Spellman Tenant, per plan, | Remodel | 4/1/2015 | $219,500 | SEATTLE | 8/23/2024 |
|
6463691
| Blanket Permit for interior non-structural alterations. Tenant improvement on 38th floor of Columbia Center, "D. A. Davidson, | Remodel | 3/23/2015 | $110,000 | SEATTLE | 8/23/2024 |
|
6462611
| Blanket Permit for non-structural interior tenant improvements on the 34th floor of "Spec Build, | Remodel | 3/16/2015 | $118,750 | SEATTLE | 8/23/2024 |
|
6462610
| Blanket Permit for non-structural interior tenant improvement on the 25th floor of "Spec Build, | Remodel | 3/16/2015 | $155,300 | SEATTLE | 8/23/2024 |
|
6456378
| Tenant improvements and change use from former bank to restaurant (Monorail Espresso) on portion of 4th floor, and occupy per plan., | Remodel | 2/17/2015 | $90,000 | SEATTLE | 8/23/2024 |
|
6456063
| Blanket Permit for interior non-structural alterations to the 28th floor for tenant Sears, per plan, | Remodel | 2/6/2015 | $300,000 | SEATTLE | 8/23/2024 |
|
6446635
| Blanket Permit for interior non-structural alterations for tenant, Mass Mutual Financial Group, 11th floor, per plan., | Remodel | 12/11/2014 | $550,000 | SEATTLE | 8/23/2024 |
|
6438158
| Blanket Permit for interior non-structural alterations to 18th, 19th, and 20th floor for City Attorney offices, per plan., | Remodel | 11/26/2014 | $4,013,973 | SEATTLE | 8/23/2024 |
|
6443730
| Construct tenant improvements in existing Ravishing Radish (73rd floor), per floor plan subject to field inspection (STFI), | Remodel | 10/29/2014 | $160,000 | SEATTLE | 8/23/2024 |
|
6435506
| Blanket Permit for interior non-structural alterations to 49th floor (CIGNA PERMIT SUBMITTAL) Per Plan., | Remodel | 10/3/2014 | $135,000 | SEATTLE | 8/23/2024 |
|
6432429
| Blanket Permit for interior non-structural alterations for tenant, A Place for Mom. Floor 32, | Remodel | 9/19/2014 | $625,000 | SEATTLE | 8/23/2024 |
|
6431652
| Blanket Permit for interior non-structural alterations RESTROOM UPGRADES FLOORS 9,10,29 AND 30 PER PLANS, | Remodel | 8/18/2014 | $200,000 | SEATTLE | 8/23/2024 |
|
6430654
| Interior alterations to 44th floor of Columbia Center to rooms 4515, 4440 and 4442 per plans, and subject to field inspection., | Remodel | 8/6/2014 | $250,000 | SEATTLE | 8/23/2024 |
|
6426628
| Blanket Permit for interior non-structural alterations to the 74th & 38th floor. For Freestone Capital, per plans., | Remodel | 8/1/2014 | $858,000 | SEATTLE | 8/23/2024 |
|
6426629
| Blanket Permit TI for interior non-structural alterations for 24th floor CHUBB Insurance, per plan., | Remodel | 7/29/2014 | $200,000 | SEATTLE | 8/23/2024 |
|
6412756
| Blanket Permit for interior non-structural alterations for Security Properties on 57th floor., | Remodel | 4/21/2014 | $1,300,000 | SEATTLE | 8/27/2014 |
|
6413394
| Construct non structural interior alterations to existing restaurant space ste 109 per floor plan subject to field inspection (STFI), | Remodel | 4/15/2014 | $60,000 | SEATTLE | 8/27/2014 |
|
6407689
| Blanket Permit for interior non-structural alterations for BBVA LPO seattle - 72nd floor TI, | Remodel | 3/26/2014 | $392,000 | SEATTLE | 8/27/2014 |
|
6404410
| Blanket Permit for interior non-structural alterations for 4/ 4m floor., | Remodel | 3/10/2014 | $200,000 | SEATTLE | 8/27/2014 |
|
6402751
| Blanket Permit for interior non-structural alterations for Suite 1230 Improvements to 12th floor per pans., | Remodel | 2/28/2014 | $150,000 | SEATTLE | 8/27/2014 |
|
6395470
| Structural support for accoustic partitions on floors 15, 16 and 17 of existing office building, per plans., | Remodel | 2/7/2014 | $60,000 | SEATTLE | 8/27/2014 |
|
6402087
| Blanket Permit for interior non-structural alterations for tenant, Restroom Upgrades on floors 13 and 14., | Remodel | 2/4/2014 | $80,000 | SEATTLE | 8/27/2014 |
|
6399256
| Blanket Permit for interior non-structural alterations, tenant improvement to the 67th floor common areas, per plan., | Remodel | 2/4/2014 | $100,000 | SEATTLE | 8/27/2014 |
|
6397494
| Blanket Permit for interior non-structural alterations for IO & OAS Field Office to 28th floor per plans., | Remodel | 1/27/2014 | $200,000 | SEATTLE | 8/27/2014 |
|
6392170
| Construct interior alterations for convenience stair between floors 13 and 14 in existing commercial building, per plan., | Remodel | 1/23/2014 | $100,000 | SEATTLE | 8/27/2014 |
|
6397195
| Blanket Permit for interior non-structural alterations for tenant, Health and Human Services on floors 15,16 and 17., | Remodel | 1/21/2014 | $2,733,300 | SEATTLE | 8/27/2014 |
|
6396866
| Blanket Permit for interior non-structural alterations for Social Security Administration to 9th, 10th, 20th, 22nd, 24th, 29th, 30th and 35th floor per plans., | Remodel | 1/10/2014 | $1,100,000 | SEATTLE | 8/23/2024 |
|
6386059
| Blanket Permit for interior non-structural alterations to 25th floor for Fidelity National Financial per plans., | Remodel | 10/16/2013 | $220,250 | SEATTLE | 8/27/2014 |
|
6384518
| Construct alterations to the update bathrooms on floors 15 thru 17 per plan subject to field inspection, STFI, | Remodel | 9/25/2013 | $150,000 | SEATTLE | 8/27/2014 |
|
6379523
| Blanket Permit for interior non-structural alterations to 4th floor for Lobgby & Coffee Area per plans., | Remodel | 9/9/2013 | $125,000 | SEATTLE | 8/23/2024 |
|
6371615
| Blanket Permit for interior non-structural alterations for Burgess Design floor 26., | Remodel | 7/23/2013 | $1,250,000 | SEATTLE | 8/27/2014 |
|
6370422
| Blanket Permit for interior non-structural alterations for floors 7 and 8., | Remodel | 7/8/2013 | $1,990,980 | SEATTLE | 8/27/2014 |
|
6359894
| Alterations to expand assembly area "Skyview Observatory" on 73rd level of existing commercial building and change use from office to assembly (lecture and meeting hall)and occupy, per plan., | Remodel | 5/7/2013 | $250,000 | SEATTLE | 7/10/2013 |
|
6308638
| Tenant improvements to Suite 207. Change use from general retail to indoor participant sports and recreation and occupy, per plans., | Remodel | 2/27/2012 | $300,000 | SEATTLE | 7/11/2012 |
|
6280865
| Blanket Permit for interior non-structural alterations vacant suite prep 8th floor, 13th-17th floors. | Remodel | 5/5/2011 | $350,000 | SEATTLE | 7/11/2012 |
|
6224687
| Blanket permit for interior TI for office space on floors 58, 59, 60 and 61. | Remodel | 9/8/2009 | $1,500,000 | SEATTLE | 8/11/2010 |
|
8189818
| Blanket permit for interior non-structural alterations for the 65th flr - Beacon Capital - Common area upgrade. | Remodel | 8/11/2008 | $129,000 | SEATTLE | 6/12/2009 |
|
6189821
| Blanket permit for interior non-structural alterations to the 40th floor Beacon Capital - common area upgrade. | Remodel | 8/11/2008 | $0 | SEATTLE | 6/12/2009 |
|
6189820
| Blanket permit for interior non-structural alterations to the 56th flr Beacon Capital - Common area upgrade | Remodel | 8/11/2008 | $70,000 | SEATTLE | 6/12/2009 |
|
6189819
| Blanket permit for interior non-structural alterations to the 64th floor Beacon Capital - Common area upgrade. | Remodel | 8/11/2008 | $70,000 | SEATTLE | 6/12/2009 |
|
6189817
| Blanket permit for interior non=structural alterations to the 63rd flr Beacon Capital Common area upgrade. | Remodel | 8/11/2008 | $70,000 | SEATTLE | 6/12/2009 |
|
6190222
| Replace existing 3.5 ton watersource heat pump equipment like for like at 1st floor. | Accessory, New | 8/5/2008 | $4,562 | SEATTLE | 6/12/2009 |
|
6094157
| Blanket permit for interior non-structural atterations for 2 floors. | Remodel | 4/28/2006 | $2,453,311 | SEATTLE | 6/30/2006 |
|
6072401
| | Remodel | 1/27/2006 | $1,800,000 | SEATTLE | 6/30/2006 |
|
6070918
| | Remodel | 8/31/2005 | $3,700,000 | SEATTLE | 6/30/2006 |
|
750855
| | Remodel | 5/27/2005 | $120,000 | SEATTLE | 7/7/2005 |
|
712213
| None | Remodel | 3/13/2000 | $0 | SEATTLE | 8/23/2024 |
|
707699
| None | Remodel | 7/23/1999 | $150,000 | SEATTLE | 8/23/2024 |
|
|
|
Reference Links:
Notice mailing date: 10/15/2026
|
|