|
EMF24-00482
| Stadter: (4) Light Fixture - circuit; (1) Switch - circuit; (2) Fan, | | 1/22/2024 | $1,500 | KIRKLAND | |
|
BNO23-06626
| BREAKERS CONDOS PIER REPAIR-Repair the existing pier with grated decking material, and remove the existing gate during construction to refurbish and reinstall. (Dock or Pier)., | Other | 10/3/2023 | $130,103 | KIRKLAND | |
|
FIR19-09643
| Breakers Condos: FA upgrade-Remove and replace existing fire alarm panel and devices with addressable devices. Remove and replace existing mini horns in bedrooms with low frequency horns. Install 4 additional low frequency horns in bedrooms. A (Multi | Other | 1/9/2020 | $20,000 | KIRKLAND | 9/29/2020 |
|
ELV19-09594
| 4511 LK WA BLVD NE CONDO'S - A (Multifamily Residential Repair or Replacement) project installing 38 Fire Alarms., | | 12/9/2019 | $20,000 | KIRKLAND | 9/29/2020 |
|
MMF18-07216
| Breakers Condos (Balcom Unit 3) H/P: Install single-head ductless H/P & (2) air handles, | Other | 10/24/2018 | $12,000 | KIRKLAND | 8/28/2019 |
|
MMF18-06269
| BALCOM RESIDENCE - UNIT 3 - A (Multifamily Residential Repair or Replacement) project installing A Ventilation System., | Other | 9/6/2018 | $1,500 | KIRKLAND | 8/28/2019 |
|
BMF18-01521
| CB Remodel (Unit 3): Renovation of Existing third floor Condo (2651sf +/-) Relocate existing kitchen, relocate master bath fixtures, new sliding glass door and header, remove one load bearing wall and replace with a header, miscellaneous non bearing | Building, New | 5/30/2018 | $118,000 | KIRKLAND | 8/28/2019 |