M26002389
| Remove the failing lining in the plant´┐¢s influent division channel conduct surface repairs and surface preparation as needed install new coatings and replace approx. 50 LF of 8" HDPE DR 17 pipe and fittings. In addition the project will involve, | Other | 5/11/2026 | $2,165,122 | RENTON | 7/28/2026 |
|
M26002166
| Installation and replacement of key components of the Biogas system at the South Treatment Plant (STP) in Renton WA. The work of the contract includes but is not limited to replacement of the gas dehydration system waste gas burners scrubbing w, | Other | 4/28/2026 | $2,500,000 | RENTON | 7/28/2026 |
|
B25006207
| KING COUNTY WASTEWATER TREATMENT PLANT DAFT REHAB PROJECT- REPLACEMENT OF WASTEWATER TREATMENT EQUIPMENT, | Remodel | 4/27/2026 | $1,283,190 | RENTON | 7/28/2026 |
|
B25006427
| KING COUNTY WASTEWATER DIVISION- SOUTH WASTEWATER TREATMENT PLANT DIVISION CHANNEL RECOATING PROJECT., | Remodel | 2/26/2026 | $1,290,168 | RENTON | 7/28/2026 |
|
E26000766
| Remove and replace 6 large UPS systems ranging from 30KVA to 80KVA., | | 2/12/2026 | $275,000 | RENTON | 7/28/2026 |
|
E26000731
| Install 2 post rack and ladder trap is server room install tie cabling from new 2 post rack to server cabinet 1 & 2, | | 2/11/2026 | $26,000 | RENTON | 7/28/2026 |
|
M26000048
| The purpose of the project is to replace an aging 400kW essential service standby generator generator replacement panel and associated accessories and circuiting. The project also includes the replacement of existing non-functional underground fue, | Other | 1/6/2026 | $1,395,761 | RENTON | 7/28/2026 |
|
E25006437
| King County South Treatment Plant Essential Services Standby Generator Replacement. Replace existing Generator Fuel Detection and MCC., | | 12/30/2025 | $355,888 | RENTON | 7/28/2026 |
|
E25004672
| King County Metro South Treatment Plant EV Charging Stations. Installation of 5 electrical vehicle chargers. Includes installing transformers and panelboard. NOTE: Attachment was not reviewed for approval and is for reference only. SEPARATE BUIDING, | | 12/18/2025 | $108,258 | RENTON | 7/28/2026 |
|
E25005811
| Building fire alarm system tenant improvement., | | 12/11/2025 | $2,710 | RENTON | 7/28/2026 |
|
M25004015
| KING COUNTY WASTEWATER TRUCK BAY VENTILATION SYSTEM. Install roof top air Handling Unit and ductwork. Not heating or cooling., | Other | 12/9/2025 | $122,500 | RENTON | 7/28/2026 |
|
B24006475
| KING COUNTY TREATMENT PLANT GAS BURNER EQUIPMENT PADS. NEW EQUIPMENT PADS IN EXISTING WASTE GAS BURNER ENCLOSURE, | Remodel | 11/7/2025 | $109,318 | RENTON | 7/28/2026 |
|
B24006473
| KING COUNTY SOUTH TREATMENT PLANT GAS DRYER CANOPY. NEW PREFABRICATED METAL CANOPY OVER GAS DRYERS, | Remodel | 11/7/2025 | $64,305 | RENTON | 7/28/2026 |
|
B24006469
| KING COUNTY SOUTH TREATMENT PLANT THERMAL OXIDIZER PAD. NEW EQUIPMENT SLAB FOR NEW FLASH VESSEL AND THERMAL OXIDIZER., | Remodel | 11/7/2025 | $214,779 | RENTON | 7/28/2026 |
|
B24005505
| KING COUNTY WASTE WATER TREATMNT SOUTH PLANT. REPLACEMENT OF ESSENTIAL SERVICES GENERATOR AT THE SOUTH TREATMENT PLANT., | Remodel | 10/10/2025 | $1,960,000 | RENTON | 7/28/2026 |
|
E25004672
| South Treatment Plant EV Charging Stations. Installation of 5 electrical vehicle chargers. Includes installing transformers and panelboard. NOTE: Attachment was not reviewed for approval and is for reference only., | | 9/15/2025 | $108,258 | RENTON | 7/28/2026 |
|
E25004478
| Installation of pathway and wire for two VFD/AHU units, | | 9/4/2025 | $15,000 | RENTON | 7/28/2026 |
|
B25001571
| KING COUNTY WASTEWATER TREATMENT PLANT - INSTALL 5 ELECTRICAL VEHICLE PEDESTAL CHARGERS, | Remodel | 5/15/2025 | $93,000 | RENTON | 7/9/2025 |
|
B25001076
| KING COUNTY WASTEWATER TREATMENT PLANT- GATE FRAME/SAFETY STAIR INSTALL (DIVISION CHANNEL), | Remodel | 4/14/2025 | $20,000 | RENTON | 7/9/2025 |
|
B25001122
| KING COUNTY SOUTH TREATMENT PLANT SAFETY GATE SYSTEM, | Remodel | 4/11/2025 | $50,000 | RENTON | 7/9/2025 |
|
E25000444
| Replace 2 pumps, | | 1/28/2025 | $16,000 | RENTON | 5/14/2025 |
|
B24004966
| PATCHING OF CORRODED CONCRETE UNDER FOUL AIR DUCTS MODIFICATION AND REAPLCEMENT OF EXISTING FLOOR-LEVEL COVER PANELS REPLACING 2 TON MONORAIL TROLLEY HOIST SYSTEM REPLACING AGED STOP-LOG GATES., | Remodel | 12/4/2024 | $365,000 | RENTON | 7/9/2025 |
|
E24004944
| King County South Treatment Plant EPA BRRR Compliance. Install 3 flow meters and the associated instrumentation and control wiring., | | 10/31/2024 | $90,000 | RENTON | 5/14/2025 |
|
B24003157
| King County Loop Compost Project 60'x39' fabric canopy structure, | Remodel | 9/25/2024 | $95,520 | RENTON | 5/14/2025 |
|
E24004163
| Add ammonium and nitrate probes to the secondary aeration tanks at King County's South Treatment Plant Note: No plan review required based on description of work and/or fixtures selected. Attachment was not reviewed for approval and is for reference | | 8/23/2024 | $262,900 | RENTON | 5/1/2025 |
|
E23006085
| King County South Treatment Plant Siloxane Removal System. Add controls and instrumentation to new siloxane removal system. Integration of new controls into existing PLC., | | 1/11/2024 | $52,220 | RENTON | 7/2/2024 |
|
B23001945
| MAKE IMPROVEMENTS TO TRUCK LOADING BAY AREA VENTILATION SYSTEM. OWNER ACTING AS CONTRACTOR., | Remodel | 12/21/2023 | $869,575 | RENTON | 7/9/2025 |
|
E23005667
| King County Wastewater Treatment Plant. Install an interim alkalinity feed system consisting of a new alkalinity tank pump skid system and associated components. NOTE: No plan review required based on description of work. Attachment was not reviewed | | 11/16/2023 | $300,000 | RENTON | 7/2/2024 |
|
B22006463
| K.C. WASTE WATER TREATMENT PLANT- MODIFY THE HVAC SYSTEM IN COMPUTER ROOM REPLACE EXISTING HALON FIRE SUPPRESSION SYTEMS WITH A HALO CARBON GAS (TOTAL FLOODING SYSTEM) ADD NEW SMOKE DETECTORS INCLUDING EARLY WARNING SMOKE DETECTION ALARMS MODIFY COMP | Remodel | 9/29/2023 | $151,728 | RENTON | 7/9/2025 |
|
B23003539
| DEMOLITION AND INSTALLATION OF NEW CONCRETE PADS FOR MECHANICAL EQUIPMENT, | Remodel | 9/14/2023 | $8,700 | RENTON | 5/1/2025 |
|
B23003956
| REMOVE SELECT EXISTING GATE FRAMES AND INSTALL FOUR NEW BOLT-IN GATE FRAMES. SOUTH PLANT DIVISION CHANNEL., | Remodel | 8/18/2023 | $758,105 | RENTON | 5/1/2025 |
|
E23003957
| KING COUNTY SOUTH TREATMENT PLANT T.I. - LOW VOLTAGE ELECTRICAL FOR FIRE ALARM SYSTEM UPDATES. NOTE: No work shall be started without issuance of the required associated fire permit., | | 8/1/2023 | $309,802 | RENTON | 7/2/2024 |
|
B23003044
| REHABILITATE AN EXISTING LIQUID CHEMICAL FEED SYSTEM BY INSTALLING A NEW ABOVE GRADE STORAGE TANK & ANCHORAGE CHEMICAL FEED PUMPS AND ASSOCIATED PIPING., | Remodel | 6/27/2023 | $270,000 | RENTON | 5/1/2025 |
|
E23002767
| Remove existing electrical and controls for odor control pumps. Install new electrical and controls for new odor control pump skid, | | 5/25/2023 | $40,000 | RENTON | 7/26/2023 |
|
B22005232
| REPLACEMENT OF EQUIPMENT WEIGHING 32400 LBS ON EXISTING STRUCTURAL CONCRETE PAD., | Remodel | 11/14/2022 | $550,000 | RENTON | 7/2/2024 |
|
E22004668
| South Treatment Plant Heating Systems Improvements. Upgrades to the existing plant's hot water system. Demo of existing system and install of new circ pumps heat exchangers heat extractors and all associated controls. No plan review required based on | | 9/12/2022 | $2,000,000 | RENTON | 5/1/2025 |
|
M22004651
| Tenant improvement involves the installation of siloxane scrubbers., | Other | 8/31/2022 | $665,562 | RENTON | 7/2/2024 |
|
P22003957
| This measure provides a siloxane polisher at the end of the bio-methane cleaning process pipeline to remove siloxane. NOTE: No plan review required based on description of work. Attachment was not reviewed for approval and is for reference only., | | 7/27/2022 | $225,000 | RENTON | 7/2/2024 |
|
B22001349
| KING COUNTY WASTEWATER TREATMENT DIVISION CONCRETE PAD. DEMOLITION OF EXISTING CONCRETE PAD AND CONSTRUCTION OF NEW CONCRETE PAD., | Remodel | 7/26/2022 | $45,000 | RENTON | 5/11/2023 |
|
E22002692
| Install new water softener system, | | 5/23/2022 | $8,000 | RENTON | 7/8/2022 |
|
M22001181
| INSTALL GAS PIPING FOR THE Upgrade size of existing 500 gallon propane tank to 1000 gallon tank to meet business needs. Requires installation of temporary 500 gallon propane tank removal of existing 500 gallon tank demo of existing concrete pad and c | Other | 3/10/2022 | $450,000 | RENTON | 5/11/2023 |
|
P22000830
| Connect P Trap and faucet on (1) sink, | | 2/18/2022 | $800 | RENTON | 7/8/2022 |
|
E22000556
| low voltage for fire suppression release panel and controls replacement. NOTE: No plan review required based on description of work. Attachment was not reviewed for approval and is for reference only., | | 2/3/2022 | $2,100 | RENTON | 7/8/2022 |
|
B21006171
| The King County Wastewater Treatment Division proposes to replace the roof of the existing South Treatment Plant Electrical Substation Secondary Facility located within King County Parcel 2423049006 at 1200 Monster Road SW Renton 98057. The new roof | Remodel | 1/12/2022 | $18,000 | RENTON | 7/26/2023 |
|
E22000045
| relocate duplex receptacle move power for projector and motor screen., | | 1/4/2022 | $2,000 | RENTON | 7/8/2022 |
|
B19006697
| DEMOLISH FUEL CELL, | Demolition | 11/15/2021 | $320,000 | RENTON | 5/11/2023 |
|
B19006693
| KC SOUTH TREATMENT PLANT FUEL CELL DEMO, | Demolition | 11/15/2021 | $320,000 | RENTON | 7/8/2022 |
|
M21004584
| Anchor Bolts, | Other | 9/27/2021 | $500 | RENTON | 5/11/2023 |
|
E21004416
| Low Voltage permit Installation of Cat 6 and fiber optic cables, | | 9/13/2021 | $12,000 | RENTON | 7/8/2022 |
|
B21002996
| INTERIOR REMODEL OF TRAINING ROOM IN ADMINISTRATION BUILDING. REMOVE NON-LOAD BEARING PARTITION WALL. REPLACE SINK COUNTERTOP AND BACK SPLASH. RELOCATE ELECTRICAL AND DATA., | Remodel | 9/8/2021 | $50,000 | RENTON | 7/8/2022 |
|
E21002009
| Add new heat trace and GFCI circuit, | | 5/5/2021 | $17,065 | RENTON | 7/7/2021 |
|
E20005235
| KING COUNTY WASTE SOUTH FIRE ALARM- ADD 50 DEVICES TO EXISTING, | | 11/24/2020 | $1,000 | RENTON | 7/7/2021 |
|
E20004834
| R&R 1 ea. fuel dispenser using existing conduit and wire, | | 10/20/2020 | $1,600 | RENTON | 7/7/2021 |
|
E20001726
| Replacing the Cathodic Protection System on 2 underground Storage Tanks located at South Plant Treatment, | | 4/24/2020 | $70,000 | RENTON | 7/1/2020 |
|
B19003810
| REPAIR/RETROFIT EXISTING SKYBRIDGE AND PIPE CHASE THAT CONNECTS TO DIGESTER 2 ROOF TO THE BLENDED STORAGE TANK ROOF. PLATES AND ANCHORS BOLTS WILL BE ATTACHED TO THE EXISTING BRIDGE GIRDERS TO PROVIDE RE-ENFORCEMENT AND RESTORE BEARING CAPACITY. SHOR | Remodel | 10/9/2019 | $48,833 | RENTON | 7/1/2020 |
|
B18005622
| MODIFY RAILING AROUND AERATION POND AND INSTALL PLATFORM AND LADDER SUPPORT STRUCTURE TO PROVIDE SAFER MAINTENANCE ACCESS TO THE AERATION POND., | Remodel | 11/14/2018 | $737,000 | RENTON | 6/19/2019 |
|
P17005277
| KING COUNTY- PLUMBING FOR NEW WATER RECLAIM STRUCTURE- 4 FIX AND (2) EYE WASH STATIONS, | | 11/8/2017 | $250,000 | RENTON | 5/16/2019 |
|
B16006588
| DEMOLISH EXISTING 168 SQUARE FOOT WATER RECLAIM STRUCTURE AND BUILD NEW 363 SQUARE FOOT WATER RECLAIM STRUCTURE. REPLACES B16006041. DEMOLITION TO BE COMPLETED BEFORE FRAMING INSPECTION., | Remodel | 1/23/2017 | $250,000 | RENTON | 5/16/2019 |
|
M120262
| KC WASTEWATER PLANT-NEW ROOFTOP AHU, | Remodel | 7/9/2012 | $66,750 | RENTON | 5/16/2019 |
|
B120214
| CONCRETE PADS FOR STORAGE TANK FOR KING COUNTY WASTEWATER TREATMENT PLANT, | Remodel | 6/26/2012 | $55,000 | RENTON | 5/16/2019 |
|
B120109
| SOUTH POINT TREATMENT PLANT-INSTALL TWO (2) CONCRETE MOUNTING PADS ON EXISTING CONCRETE SLAB TO MOUNT REPLACEMENT BLOWERS, | Remodel | 4/6/2012 | $11,000 | RENTON | 5/16/2019 |
|
B090197
| Demo (7) attached modular buildings. | Demolition | 5/27/2009 | $0 | RENTON | 5/16/2019 |
|
B080483
| K.C. S treatment - sodium Hypoclorite disinfection system. | Other | 10/17/2008 | $2,750,000 | RENTON | 5/16/2019 |
|
B070465
| Install temporary trailer during construction of A. | Accessory, New | 9/27/2007 | $400,000 | RENTON | 5/16/2019 |
|
B060459
| Construct new admin bldg. for Metro. | Building, New | 12/29/2006 | $1,829,452 | RENTON | 5/16/2019 |
|
B050632
| | Other | 1/25/2006 | $2,300,000 | RENTON | 5/16/2019 |
|
B030606
| | Building, New | 6/9/2004 | $2,200,000 | RENTON | 5/16/2019 |
|
B030176
| | Other | 9/4/2003 | $550,000 | RENTON | 5/16/2019 |
|
B020640
| | Building, New | 3/14/2003 | $5,030,000 | RENTON | 5/16/2019 |
|
B990441