| Parcel | 282404-9007 |
| Name | KING COUNTY-AIRPORT |
| Site Address | 6771 PERIMETER RD S |
| Geo Area |
35-70
|
| Spec Area |
|
| Property Name | KING CO AIRPORT (imps) |
|
| Jurisdiction | SEATTLE |
| Levy Code | 0010 |
| Property Type |
C
|
| Plat Block / Building Number | |
| Plat Lot / Unit Number | |
| Quarter-Section-Township-Range |
SE-28-24-4
|
|
|
|
| Highest & Best Use As If Vacant | REGIONAL LAND USE |
| Highest & Best Use As Improved | PRESENT USE |
| Present Use | Air Terminal and Hangars |
| Land SqFt | 24,602,548 |
| Acres | 564.80 |
|
| Percentage Unusable | |
| Unbuildable | NO |
| Restrictive Size Shape | NO |
| Zoning | MML U/85 |
| Water | WATER DISTRICT |
| Sewer/Septic | PUBLIC |
| Road Access | PUBLIC |
| Parking | ADEQUATE |
| Street Surface | |
|
|
Views |
Waterfront |
| Rainier | |
| Territorial | |
| Olympics | |
| Cascades | |
| Seattle Skyline | |
| Puget Sound | |
| Lake Washington | |
| Lake Sammamish | |
| Lake/River/Creek | |
| Other View | |
|
| Waterfront Location | |
| Waterfront Footage | 0 |
| Lot Depth Factor | 0 |
| Waterfront Bank | |
| Tide/Shore | |
| Waterfront Restricted Access | |
| Waterfront Access Rights | NO |
| Poor Quality | NO |
| Proximity Influence | NO |
|
|
Designations |
Nuisances |
| Historic Site | |
| Current Use | (none) |
| Nbr Bldg Sites | |
| Adjacent to Golf Fairway | NO |
| Adjacent to Greenbelt | NO |
| Other Designation | NO |
| Deed Restrictions | NO |
| Development Rights Purchased | NO |
| Easements | NO |
| Native Growth Protection Easement | NO |
| DNR Lease | NO |
|
| Topography | |
| Traffic Noise | |
| Airport Noise | |
| Power Lines | NO |
| Other Nuisances | NO |
|
|
Problems |
| Water Problems | NO |
| Transportation Concurrency | NO |
| Other Problems | NO |
|
|
Environmental |
|
Section(s) Of Building Number:
1
|
1
| HANGAR, MAINTENANCE & OFFICE (329) | | 1 | 36 | 1 | 27,040 | 27,040 |
Section Feature(s) Of Section Number:
1
| Feature Type | Gross Sq Ft | Net Sq Ft |
| MEZZANINES-OFFICE (761) | 3,250 | 3,250 |
Accessory
| Storage Tanks |
| | | | | (unknown) | | | 1015000 | 6/30/1999 |
|
| Change to state law (RCW 84. 40.045 and 84.40.175) by the 2013 Legislature eliminated revaluation of government owned parcels. |
|
|
3331468
|
20250528000128
|
5/14/2025
| $10,500,000.00 | POPLAR GLEN LLC | XYZ OPSCO LLC | Bargain and Sales Deed | None |
|
3277948
|
20240417000649
|
4/17/2024
| $18,175,000.00 | GDH1 LLC | MSN EQUIPMENT LEASING LLC | Other - See Affidavit | None |
|
2904339
|
20171204002045
|
12/1/2017
| $2,665,500.00 | 7747 PERIMETER ROAD LLC | 7747 AVIATION LLC | Special Warranty Deed | None |
|
2762549
|
20151021001664
|
10/16/2015
| $5,500,000.00 | QUAD 7 DEVELOPMENT LLC | POPLAR GLEN LLC | Bargain and Sales Deed | None |
|
2747629
|
20150804000983
|
7/31/2015
| $4,650,000.00 | QUAD 7 DEVELOPMENT LLC | 7747 PERIMETER ROAD LLC | Special Warranty Deed | None |
|
2684296
|
20140811001273
|
8/11/2014
| $1,726,700.00 | ASHTON BFI PROPERTY LLC | HIGH PLATEAU VENTURES LLC | Quit Claim Deed | None |
|
2704897
|
20141210001892
|
1/4/2014
| $0.00 | HIGH PLATEAU VENTURES LLC | 7023 PERIMETER ROAD LLC | Quit Claim Deed | Other |
|
2524165
|
|
12/27/2011
| $12,975,000.00 | GRE AIRPORT LLC | J & J AIRPORT PROPERTIES LLC | Statutory Warranty Deed | Other |
|
2503990
|
20110805000353
|
8/5/2011
| $1,000.00 | GALVIN AVIATION L L C | QUAD 7 DEVELOPMENT L L C | Quit Claim Deed | None |
|
2481342
|
20110307001389
|
2/28/2011
| $0.00 | WINGS ALOFT LEASING LLC | GATEWAY USA LLC | Quit Claim Deed | Other |
|
2341080
|
20080410001187
|
4/10/2008
| $9,750,000.00 | CHC PROPERTIES LLC | GRE AIRPORT LLC | Statutory Warranty Deed | None |
|
2341077
|
20080410001186
|
4/9/2008
| $0.00 | WALLING KAREN | CHC PROPERTIES LLC | Quit Claim Deed | Other |
|
2296422
|
20070705001422
|
7/3/2007
| $4,000,000.00 | KIHLSTROM ROBERT M+JOLETTE M | ASHTON BFI PROPERTY LLC | Quit Claim Deed | None |
|
1955622
|
|
4/30/2003
| $2,408,733.00 | FLIGHT OPERATIONS INC | GATEWAY USA L L C | Other - See Affidavit | None |
|
1922675
|
20021119002702
|
11/19/2002
| $289,387.00 | KBF INC | PAJARO L L C | Statutory Warranty Deed | None |
|
1826750
|
20010629001553
|
5/30/2001
| $175,000.00 | RECOR JEFFREY L+JOANN E | CAMPBELL SPENCER D+MARIE E | Quit Claim Deed | None |
|
1694437
|
19990629000775
|
6/29/1999
| $352,900.00 | SEATTLE AIR CORPORATION | BFI HOLDINGS LLC | Other - See Affidavit | Other |
|
1670749
|
199903032123
|
3/3/1999
| $5,600,000.00 | PERIMETER PROPERTIES INC | GALVIN AIRCRAFT SERVICE LLC | Statutory Warranty Deed | None |
|
1730058
|
19991230001549
|
2/24/1999
| $135,006.00 | RICHARDSON GINI ET AL | HILL MICHAEL | Other - See Affidavit | Estate Settlement |
|
1610839
|
199805080897
|
5/7/1998
| $700,000.00 | AVIATION ASSOCIATES | WINGS ALOFT LEASING L L C | Other - See Affidavit | Other |
|
1529032
|
199702210771
|
2/21/1997
| $2,036,021.00 | LOWER CAPITAL GAINS INC | KIHLSTROM ROBERT M+JOLETTE M | Quit Claim Deed | Other |
|
1502820
|
199608281587
|
8/28/1996
| $5,600,000.00 | KIHLSTROM ROBERT M+JOLETTE | PERIMETER PROPERTIES INC | Statutory Warranty Deed | Other |
|
1502819
|
199608281585
|
8/28/1996
| $2,300,000.00 | KIHLSTROM ROBERT M+JOLETTE M | HANGAR HOLDINGS INC | Statutory Warranty Deed | Other |
|
1428545
|
199505170000
|
5/16/1995
| $1,180,000.00 | PAGE PROPERTIES INC | MCCAW FLIGHT OPERATIONS INC | Other - See Affidavit | None |
|
1340537
|
199311031810
|
10/27/1993
| $100,000.00 | HOWARD CLIFFORD+RUTH | KBF INC | Warranty Deed | Other |
|
|
|
7142465-EL
| Provide (1) 20A circuit for fire alarm outlet-Job #202938, | | 5/11/2026 | $0 | SEATTLE | 6/9/2026 |
|
7141658-EL
| Reconfiguring (9) circuits to meet new cubicle layout. SEQ#203675, | | 5/5/2026 | $0 | SEATTLE | 6/9/2026 |
|
7138720-EL
| KCIA Temp Power Service - Job 4006605: Install 200A 120/208v service on property utilizing existing pathway from utility pole mounted transformer and U/G pathway. Intercept existing pathway and extend no more than 10' to new service mounted on unis | | 4/16/2026 | $0 | SEATTLE | 5/21/2026 |
|
DEMO26-0005
| Cut and cap utilities; abate hazardous materials and demolish buildings to slab on grade; restore fence line for security; reconnect site lighting., | Demolition | 3/25/2026 | $0 | KING COUNTY | |
|
7134915-EL
| Elevator Modernization, | | 3/24/2026 | $0 | SEATTLE | 6/9/2026 |
|
7132736-RF
| Install 1 Mitsubishi ductless in elevator machine service room and run line up to rooftop, | Other | 3/10/2026 | $37,495 | SEATTLE | 6/9/2026 |
|
7126428-EL
| | | 1/26/2026 | $0 | SEATTLE | 5/21/2026 |
|
7118355-EL
| Adding indoor heat pump from existing 15A circuit., | | 11/25/2025 | $2,000 | SEATTLE | 5/21/2026 |
|
ADDC25-0514
| | Remodel | 11/10/2025 | $0 | KING COUNTY | |
|
7116113-EL
| Install Two Car Chargers, | | 11/10/2025 | $8,000 | SEATTLE | 6/9/2026 |
|
7114032-EL
| Installing a cell dialer to monitor the FACP., | | 10/28/2025 | $2,300 | SEATTLE | 5/21/2026 |
|
7112725-EL
| We are installing a 100amp pin & sleeve., | | 10/21/2025 | $10,000 | SEATTLE | 6/9/2026 |
|
7107250-EL
| HVAC Low Voltage Wiring., | | 9/17/2025 | $28,750 | SEATTLE | 6/9/2026 |
|
7103850-EL
| Hertz Car Rental (Suite 104)-low voltage wiring for installation of video surveillance system-Open Eye Conversion, | | 8/27/2025 | $2,623 | SEATTLE | 5/21/2026 |
|
ADDC25-0099
| Modify existing blast fence and relocate utilities at N. Boeing field, | Remodel | 8/26/2025 | $2,800,000 | KING COUNTY | |
|
7103075-EL
| 12 cameras Job 836328, | | 8/22/2025 | $8,000 | SEATTLE | 6/9/2026 |
|
7103074-EL
| 7 cameras and 1 antena, fiber between hanger 3 and 4, | | 8/22/2025 | $8,000 | SEATTLE | 6/9/2026 |
|
7103070-EL
| 1 camera, 1 antena, Job 836328, | | 8/22/2025 | $8,000 | SEATTLE | 6/9/2026 |
|
7103069-EL
| 12 cameras Job 836328, | | 8/22/2025 | $8,450 | SEATTLE | 6/9/2026 |
|
7102775-EL
| Replace partial data conduit run to light pole, | | 8/21/2025 | $1,500 | SEATTLE | 5/21/2026 |
|
7101244-EL
| 2 sign circuits from the 2nd floor electrical room following existing pathway up to the first sign and left available to sign installers per the print, | | 8/12/2025 | $16,000 | SEATTLE | 6/9/2026 |
|
7100857-EL
| Troubleshoot hangar door, | | 8/11/2025 | $500 | SEATTLE | 5/21/2026 |
|
7100343-EL
| SDOT Service Cabinet for new Signal @ 16th Ave S & East Marginal Way S. Work is in ROW. Official Seattle City Light service address is 7609 E. Marginal Way S. Pemit address is closest that was allowed by permit system., | | 8/6/2025 | $5,000 | SEATTLE | 5/21/2026 |
|
7096330-EL
| Install 1 Cat6A to 9 WAP locations / 1 Cat6A to 3 TV locations / 2 Cat6A to 6 station locations / 4 Cat6A to 3 station locations, | | 7/15/2025 | $10,000 | SEATTLE | 6/9/2026 |
|
7094808-EL
| Installing 2 fire rated backboards and 1 cabinet 3 cat 6a to 1 location., | | 7/7/2025 | $5,000 | SEATTLE | 5/21/2026 |
|
7092062-EL
| Installation of an AES Radio Communicator to an existing Fire Alarm System and power supply., | | 6/19/2025 | $2,526 | SEATTLE | 5/21/2026 |
|
7085851-EL
| CAT6 cabling for office and Wireless access points., | | 5/14/2025 | $25,000 | SEATTLE | 6/9/2026 |
|
MECH25-0455
| Remove and replace (1) existing CRAC indoor unit and corresponding outdoor unit., | Other | 4/21/2025 | $98,000 | KING COUNTY | 6/18/2025 |
|
7080814-EL
| (2) circuit alterations. 40A 480V 3 phase and the other is 20A 480V 3 phase., | | 4/15/2025 | $3,000 | SEATTLE | 5/21/2026 |
|
7076041-EL
| Upgrading low voltage access control system. Swapping card readers and control boards., | | 3/18/2025 | $30,000 | SEATTLE | 6/9/2026 |
|
7072055-EL
| Security Install cable for 17 cameras. Install 17 cameras. Job 836027, | | 2/24/2025 | $34,600 | SEATTLE | 6/9/2026 |
|
SIGN24-0016
| The scope of work includes updating signage for Signature Aviation, including the following and was revised during the resubmittal/permit review process: E05: EXISTING ±5'-0" x ±16'-6-1/4" SIGNAGE TO BE REMOVED & REPLACED; WALL TO BE REPAIRED AS | | 11/29/2024 | $0 | KING COUNTY | 6/18/2025 |
|
7043893-CN
| Construct concrete pad for utility equipment on grounds of transportation facility [KING COUNTY INTERNATIONAL AIRPORT], per plan., | Remodel | 10/2/2024 | $50,000 | SEATTLE | |
|
ADDC24-0100
| INSTALL NEW CREW SHELTER AND TWO CONEX BOXES AT BOEING B17 STALL, | Remodel | 8/5/2024 | $26,381 | KING COUNTY | |
|
7037782-EL
| Special Event Blue Angels, | | 7/26/2024 | $3,400 | SEATTLE | 5/21/2026 |
|
ADDC24-0025
| ***MODIFICATONS TO PARKING LAYOUT AND ADDITION OF NEW CMU WALL***

CONSTRUCT A NEW AIRPLANE HANGAR WITH OFFICE SPACE, FBO, AND SITE WORK., | Remodel | 7/8/2024 | $50,000 | KING COUNTY | |
|
DEMO23-0018
| DEMO AN EXISTING BUILDING RELATED TO GRADE23-0023 - 7300 BUILDING, | Demolition | 6/18/2024 | $0 | KING COUNTY | |
|
7022265-EL
| Installation of an Emergency Responder Communications Enhancement System in the UPS sort facility, | | 4/29/2024 | $98,000 | SEATTLE | |
|
7018209-EL
| 900663 - RP - RPLC PIN AND SLEEVE - ALTERED CIRCUIT, | | 4/4/2024 | $500 | SEATTLE | |
|
MECH23-0507
| Installation of mechanical systems for new airplane hangar with office spaces., | Other | 4/3/2024 | $681,925 | KING COUNTY | |
|
DEMO24-0013
| DEMOLITION OF APPROX 4,000 SF BLDG, | Demolition | 3/18/2024 | $0 | KING COUNTY | |
|
7015021-EL
| DDC job 835114, | | 3/18/2024 | $17,500 | SEATTLE | |
|
7012918-EL
| Pull (2) new circuits; Install (2) quad outlets-Seq. Job #202934, | | 3/6/2024 | $7,500 | SEATTLE | |
|
7012916-EL
| Extend lighting circuit in conduit to poles; Install (44) parking light fixtures-Seq Job #202901, | | 3/6/2024 | $200,000 | SEATTLE | |
|
7012705-EL
| Add (2) L5-20 Twistlocks to left of comm board installed in electrical room. Electrical room accessible from exterior of building but is locked. Contact Clint Roberts for access. (208) 204-8594., | | 3/5/2024 | $1,000 | SEATTLE | |
|
7009296-EL
| 900391 - ZG - POPLAR GLENN EPM PULL THROUGH WORK., | | 2/13/2024 | $500 | SEATTLE | |
|
7009230-EL
| 900309 - RP - REPLACE ACCUITY SWITCH AND (2) PENDANT BALLASTS, | | 2/13/2024 | $2,000 | SEATTLE | |
|
7006520-EL
| 900289 - RP - SURGE PROTECTOR REPAIR (LOST LEG), | | 1/26/2024 | $1,000 | SEATTLE | |
|
7006111-EL
| ADDING A 240V CIRCUIT FOR CHARGER, | | 1/24/2024 | $4,196 | SEATTLE | |
|
7003434-EL
| PERFORM 2 HOUR LOAD BANK TEST ON STANDBY GENERATOR. DISCONNECT BUILDING CONDUCTORS, CONNECT LOAD BANK, PERFORM LOAD BANK TEST, LAND AND TORQUE BUILDING CONDUCTORS, | | 1/5/2024 | $500 | SEATTLE | |
|
7003431-EL
| PERFORM 2 HOUR LOAD BANK TEST ON STANDBY GENERATOR. DISCONNECT BUILDING CONDUCTORS, CONNECT LOAD BANK, PERFORM LOAD BANK TEST, LAND AND TORQUE BUILDING CONDUCTORS, | | 1/5/2024 | $500 | SEATTLE | |
|
6998361-EL
| Boeing 7500 E. Marginal Way S Bldg 3-326 JCI to provide 12 hours of technician labor to coordinate and install a cellular back up on an existing fire alarm system. NFPA72 requires two technicians. JCI will communicate with CMC and ensure cell unit is | | 11/29/2023 | $3,396 | SEATTLE | |
|
6998349-EL
| Boeing 7500 E. Marginal Way S, Bldg 3-390 Radio Tower JCI to provide 32 hours of technician labor to coordinate and install a cellular back up on an existing fire alarm system. NFPA72 requires two technicians. JCI will communicate with CMC and ensure | | 11/29/2023 | $5,731 | SEATTLE | |
|
6998344-EL
| Boeing 7500E. Marginal Way S Bldg 3-390 JCI to provide 34 hours of technician labor to coordinate and install a cellular back up on an existing fire alarm system. NFPA72 requires two technicians. JCI will communicate with CMC and ensure cell unit is | | 11/29/2023 | $6,002 | SEATTLE | |
|
6998286-EL
| Boeing 7500 E Marginal Way S Bldg 3-840 JCI to provide 8 hours of technician labor to coordinate and install a cellular back up on an existing fire alarm system. NFPA72 requires two technicians. JCI will communicate with CMC and ensure cell unit is a | | 11/29/2023 | $3,004 | SEATTLE | |
|
6998116-EL
| Boeing 7500 E. Marginal Way S Bldg 3-811 JCI to provide 14 hours of technician labor to coordinate and install a cellular back up on an existing fire alarm system. NFPA72 requires two technicians. JCI will communicate with CMC and ensure cell unit is | | 11/28/2023 | $3,742 | SEATTLE | |
|
6998084-EL
| Boeing-7500 E. Marginal Way S Bldg 3-354 JCI to provide 192 hours of technician labor to coordinate and install a cellular back up on an existing fire alarm system. NFPA72 requires two technicians. JCI will communicate with CMC and ensure cell unit i | | 11/28/2023 | $23,736 | SEATTLE | |
|
6997913-EL
| Boeing-7500 E. Marginal Way S. BLDG 3-812 JCI to provide 88 hours of technician labor to coordinate and install a cellular back up on an existing fire alarm system. NFPA72 requires two technicians. JCI will communicate with CMC and ensure cell unit | | 11/27/2023 | $11,744 | SEATTLE | |
|
6992740-EL
| Replace (1) existing EV charger Install (2) additional EV chargers (existing branch)., | | 10/24/2023 | $4,000 | SEATTLE | |
|
MECH23-2219
| Replace (50) Single and Dual Duct VAV boxes on 3rd Floor., | Other | 10/23/2023 | $150,000 | KING COUNTY | |
|
6982479-EL
| 350-2300944 - King Co Airport - cctv, | | 8/23/2023 | $2,602 | SEATTLE | |
|
6979748-EL
| INSTALLING (1) 20A CIRCUIT JOB #1012553, | | 8/7/2023 | $2,500 | SEATTLE | |
|
6971996-EL
| Install access controls for (6) doors, install new access control head end. Titan Electric job #2342078, | | 6/23/2023 | $13,500 | SEATTLE | |
|
6971992-EL
| Install access controls on (4) doors, install new access control head end. Titan Electric job #2342075, | | 6/23/2023 | $9,600 | SEATTLE | |
|
6971955-EL
| Install access controls for (7) doors, install (5) pneumatic pumps, install new access control head end. Titan Electric job #2342077, | | 6/23/2023 | $30,000 | SEATTLE | |
|
6969523-EL
| Install access controls for (7) doors. Titan electric job #2342076, | | 6/9/2023 | $12,000 | SEATTLE | |
|
ADDC23-0193
| KCIA IS PROPOSING TO DEMOLISH AND REPLACE APPROXIMATELY 1150 FT OF FENCE ON S ELLIS AND S ALBRO PLANCE BETWEEN S ELIZABETH STREET AND S HARDY STREET. WILL ALSO INCLUDE LANDSCAPING WHICH WILL BE LIMITED TO HYDROSEEDING, | Remodel | 5/5/2023 | $90,144 | KING COUNTY | |
|
COMM21-0015
| CONSTRCUT A NEW AIRPLAN HANGAR WITH OFFICE SPACE, FBO, AND SITE WORK., | Building, New | 2/22/2023 | $15,670,000 | KING COUNTY | |
|
SIGN22-0027
| INSTALL TWO SINGLE FACE ILLUMINATED WALL SIGNS, | | 2/21/2023 | $0 | KING COUNTY | |
|
6947513-RF
| Refer piping to 1 unit., | Other | 2/10/2023 | $0 | SEATTLE | |
|
6947509-RF
| Refer piping to 3 units., | Other | 2/10/2023 | $0 | SEATTLE | |
|
MECH22-2893
| REVISED DUCTWORK & REPLACE (32) VAV BOXES FOR OFFICE REMODEL ON SIXTH FLOOR, | Other | 1/17/2023 | $150,000 | KING COUNTY | |
|
COMM22-0008
| BRINGING ON TO THE SITE A MANUFACTURED STRUCTURE TO SERVE AS A TEMPORARY OFFICE AND TERMINAL WITH OCCUPANCY NOT EXCEEDING 18 MONTHS, | Remodel | 12/15/2022 | $30,000 | KING COUNTY | |
|
MECH22-2258
| PROVIDE NEW EXHAUST FAN, DUCT HEATER AND PERFORM MISC. DUCT AND GRD MODS AS REQUIRED. RELATED TO ADDC22-0236, | Other | 9/12/2022 | $12,471 | KING COUNTY | |
|
SIGN22-0016
| INSTALL SINGLE FACE ILLUMINATED WALL SIGN, | | 9/6/2022 | $0 | KING COUNTY | |
|
SIGN22-0015
| INSTALL TWO SINGLE FACE ILLUMINATED WALL SIGNS, | | 9/6/2022 | $0 | KING COUNTY | |
|
ADDC22-0361
| RENOVATION OF 17,670 SF OF OFFICE SPACE AT BOEING 3-800 BLDG, | Remodel | 8/16/2022 | $1,078,866 | KING COUNTY | |
|
COMM22-0009
| INSTALLATION OF (26) 8' X 19' CONEX STORAGE BOXES AT THE BOEING APRON B & C STALLS, | Building, New | 8/11/2022 | $103,000 | KING COUNTY | |
|
ADDC22-0236
| IN FIRE STATION APPARATUS BAY, ADD PRESSURE AIR TIGHT WALL AND DOOR TO CREATE A VESTIBULE BETWEEN THE FIRE STATION AND APPARATUS BAY - ALSO ADD MEZZANINE STORAGE AREA AND ADD FLOOR DRAIN IN 2ND LEVEL BATHROOM, | Remodel | 6/16/2022 | $400,000 | KING COUNTY | |
|
ADDC20-0294
| STORMWATER VAULT REVIEW FOR CMST19-0001, | Remodel | 6/10/2022 | $100,000 | KING COUNTY | |
|
DEMO22-0034
| DEMOLISH EXISTING HANGAR PRIOIR TO BUILDING PERMIT BEING ISSUED RELATED TO COMM21-0015, | Demolition | 5/26/2022 | $0 | KING COUNTY | |
|
ADDC22-0092
| CONSTRUCT 1,625 SF FREE-STANDING ENTRY DROP-OFF CANOPY FOR MODERN AVIATION'S EXISTING OFFICE/HANGAR BUILDING (COMM19-0007), | Remodel | 5/18/2022 | $200,000 | KING COUNTY | |
|
ADDC22-0132
| DEMOLISH EXISTING FENCE, LIGHT POLE AND SLAB AND INSTALL NEW FENCE AT THE BOUNDARY OF DEMOLISHED SLAB AND NEW LIGHT FIXTURES ALONG THE OVERHANG OF ADJACENT BUILDING, | Remodel | 4/7/2022 | $75,000 | KING COUNTY | |
|
DEMO22-0009
| DEMOLISH EXISTING HANGAR BUILDING TO SLAB-ON-GRADE. LEAVE EXISTING SLAB IN PLACE. PATCH ASPHALT AROUND BUILDING PERIMETER., | Demolition | 2/25/2022 | $0 | KING COUNTY | |
|
ADDC21-0768
| REROOF OF BUILDING LOCATED AT 6526 ELLIS AVE S, | Remodel | 12/21/2021 | $397,967 | KING COUNTY | |
|
ADDC21-0481
| REVISIONS TO ORIGINAL BREAK ROOM AND SIMULATION CLASSROOM LAYOUT, | Remodel | 11/8/2021 | $60,000 | KING COUNTY | |
|
COMM19-0017
| PROPOSAL TO REDEVELOP APPROX 14-ACRE LEASEHOLD WITHIN KC AIRPORT (BOEING FIELD) FOR UPS GATEWAY PACKAGE SORTING FACILITY, - CONSTRUCT APPROX 48,000 SF MAIN FACILITY WITH SMALLER SUPPORT BUILDINGS - MECHANICAL INCLUDED (PREA19-0039/VARI19-0004), | Building, New | 10/5/2021 | $11,566,673 | KING COUNTY | |
|
ADDC21-0443
| FULL FIRST FLOOR TENANT IMPROVEMENT OF OFFICE SPACE - MECHANICAL INCLUDED, | Remodel | 9/15/2021 | $1,900,000 | KING COUNTY | |
|
ADDC21-0532
| Modifications to existing stairway and upper lobby railings at KCIA main terminal building., | Remodel | 8/26/2021 | $186,202 | KING COUNTY | |
|
ADDC21-0134
| RECONFIGURE SPACE TO CREATE (2) OFFICES AND REARRANGE WORKSTATION/FURNITURE LAYOUT, | Remodel | 6/26/2021 | $28,342 | KING COUNTY | |
|
ADDC21-0157
| REMOVE EXISTING NON-STRUCTURAL OFFICE PARTITION BUILD-OUT ON GROUND LEVEL AND REMOVE EXISTING MEZZANINE OFFICE FLOOR, | Remodel | 6/22/2021 | $100,000 | KING COUNTY | |
|
ADDC21-0133
| REMOVAL AND RELOCATION OF INTERIOR WALLS TO RECONFIGURE TENANT SPACE, | Remodel | 6/15/2021 | $72,985 | KING COUNTY | |
|
MECH20-2117
| HEATING AND VENTILATION FOR HANGAR AND FULL CONDITIONING AND VENTILATION TO SHELL OFFICE BUILDING, | Other | 3/22/2021 | $82,000 | KING COUNTY | |
|
ADDC21-0005
| TENANT IMPROVEMENT TO CREATE 7,139 SF OF OFFICE SPACE WITHIN EXISTING SHELL BUILDING . See DEMO18-0023, CMST19-0001, COMM19-0007 (ph 1 hanger) , and COMM19-0023 (ph 2 office), | Remodel | 3/12/2021 | $460,000 | KING COUNTY | |
|
6810305-CN
| Construct tenant improvements for hangar at ground level of existing commercial structure, subject to field inspection (STFI), | Remodel | 1/26/2021 | $100,000 | SEATTLE | |
|
SIGN20-0019
| INSTALL (2) ILLUMINATED WALL SIGNS, | | 12/17/2020 | $0 | KING COUNTY | |
|
ADDC20-0607
| Replacement of existing swing doors with new automated sliding doors at KCIA Main Terminal building., | Remodel | 12/9/2020 | $33,095 | KING COUNTY | |
|
COMM19-0023
| CONSTRUCTION OF PHASE 2 HANGAR AND OFFICE BUILDING THAT WILL SERVE AS A FIXED BASE OF OPERATIONS FOR MULTIPLE FUTURE TENANTS. TENANT IMPROVEMENT UNDER SEPARATE COVER. THE HANGAR WILL BE 24,299 SF AND THE OFFICE WILL BE 7,139 SF OF PRE-ENGINEERED META | Building, New | 9/14/2020 | $3,519,475 | KING COUNTY | |
|
COMM19-0007
| CONSTRUCTION OF A NEW 53,313 SF AT GRADE ONE STORY HANGAR AND OFFICE BUILDING CONSTITUTING PHASE ONE UNDER PROPOSED CSDP - CMST19-0001. ALL SITE WORK WILL BE DONE UNDER THE COMMERCIAL SITE DEVELOPMENT PERMIT, TO INCLUDE PARKING, LANDSCAPING, SITE | Building, New | 7/15/2020 | $3,610,000 | KING COUNTY | |
|
DEMO20-0047
| DEMOLITION OF A BUILDING, APPROX.4,000 SQ. FT., WILL OCCUR TO ALLOW FOR SOIL REMEDIATION. HAZARDOUS MATERIALS ABATEMENT WILL BE COMPLETED PRIOR TO THE START OF THIS PROJECT., | Demolition | 6/26/2020 | $0 | KING COUNTY | |
|
MECH19-1675
| COMMERCIAL MECHANICAL FOR INSTALLATION OF HEATING AND VENTILATION FOR MODERN AVIATION HANGAR BUILDING (COMM19-0008), | Other | 11/26/2019 | $65,480 | KING COUNTY | 8/8/2022 |
|
MECH19-0603
| Like-for-like replacement of four (4) rooftop HVAC units., | Other | 6/18/2019 | $58,000 | KING COUNTY | 8/8/2022 |
|
ADDC17-0634
| REFURBISHMENT AND UPGRADE FROM HANGAR & OFFICE INTO ASSEMBLY & OFFICE INCLUDING PARTITIONS, LIGHTING, AND FINISHES; ENERGY UPGRADE, STRUCTURAL UPGRADE, SITE WORK (YARD AND PARKING LAYOUT), | Remodel | 1/7/2019 | $600,000 | KING COUNTY | |
|
COMM18-0015
| Installation of pre-fabricated restroom structure adjacent to A6 wash station at KCIA. See also: GRDE16-0076., | Remodel | 10/23/2018 | $524,800 | KING COUNTY | |
|
ADDC18-0498
| UPDATE FINISHES AND ADD ADA SHOWER IN WOMEN'S LOCKER ROOM (MECH NOT INCLUDED), | Remodel | 8/9/2018 | $500,000 | KING COUNTY | |
|
ADDC18-0381
| Construction of new exhaust covers over existing exhaust stacks at existing airport building., | Remodel | 8/2/2018 | $207,000 | KING COUNTY | |
|
DEMO18-0023
| DEMO ALL ABOVE GROUND EXISTING HANGERS/OFFICE BLDGS IN PREPARATION 
OF FUTURE CLAY LACY FBO @ KCIA. DEMO IS SUBJECT TO SEPA (7 BLDGS) (Related: PREA17-0266)
Plans in file, | Demolition | 5/3/2018 | $0 | KING COUNTY | |
|
DEMO17-0081
| Complete demolition of 60' x 32' fabric tent structure at King Cout Int'l Airport. See site plan., | Demolition | 9/28/2017 | $0 | KING COUNTY | 5/23/2018 |
|
ADDC17-0119
| Construction of new steel-framed roof canopy with single-ply membrane roof over existing fuel cabinets permitted under FIRP16-0067. See also: COMM16-0006, CMST15-0001., | Remodel | 5/12/2017 | $36,000 | KING COUNTY | 5/25/2018 |
|
6583983
| Commercial re-roof to existing commercial building., | Other | 3/2/2017 | $0 | SEATTLE | 6/27/2017 |
|
MECH16-1564
| INSTALL VARIABLE REFRIGERANT FLOW SYSTEM FOR OFFICES WITHIN HANGAR; INSTALL LARGE FANS FOR AIR CIRCULATION, | Other | 12/9/2016 | $680,000 | KING COUNTY | 9/19/2017 |
|
MECH16-1462
| INSTALL ENERGY RETROFIT FOR EXISTING TERMINAL, | Other | 12/8/2016 | $430,000 | KING COUNTY | 5/25/2018 |
|
COMM16-0020
| ADD EIGHT NEW TEST STALLS, SOUTH GATE TO TAXIWAY BRAVO WILL BE RELOCATED FURTHER TO THE SOUTH AND ENHANCED WITH SEPARATE WASH AND DE-ICING CAPABILITY. NEW CREW SHELTERS, SUPER CREW SHELTERS, TOOL BUILDINGS, SOUND WALLS AND BLAST FENCES. NEW STORM DRA | Remodel | 11/17/2016 | $2,381,344 | KING COUNTY | 5/25/2018 |
|
COMM15-0013
| PROJECT CONSISTS OF A 6,250 SF COMMERCIAL FACILITY WITH ASSOCIATED SITE DEVELOPMENT AND LANDSCAPE WORK AS WELL AS NEW RAMP/AIRCRAFT PAVING WITH 9' HIGH FENCE; MECHANICAL IS INCLUDED (PREA15-0033). SEPARATE DEMO AND CLEARING/GRADING PERMITS.PICA APPRO | Remodel | 10/27/2016 | $1,033,562 | KING COUNTY | 9/18/2017 |
|
ADDC16-0447
| REMODELING EXISING CAFETERIA, RECONFIGURE WALLS, CAFE SPACE AND MECHANICAL EQUIMENT TO IMPROVE THE CAFETERIA FOR EMPLOYEE; MECHANICAL IS NOT INCLUDED, | Remodel | 10/27/2016 | $3,097,678 | KING COUNTY | 8/27/2018 |
|
COMM16-0006
| CONSTRUCT AND OCCUPY A 61,800 SF CORPORATE AVIATION HANGAR AND SUPPORT SERVICES FACILITY; NEW OPEN FENCES MORE THAN 6' HIGH AND RETAINING WALL MORE THAN 4' HIGH; MECHANICAL IS NOT INCLUDED (CMST15-0001, PREA15-0187, VARD15-0012), | Building, New | 8/9/2016 | $7,163,503 | KING COUNTY | 5/25/2018 |
|
MECH15-1188
| INSTALL NEW RADIENT HEAT SYSTEM, OVERHEAD AHU WITH ZONE 5 VAV SYSTEM, | Other | 11/5/2015 | $317,000 | KING COUNTY | 8/23/2017 |
|
ADDC15-0423
| INTERIOR REMODEL TO EXISTING HANGAR INCLUDES NEW LOBBY , RESTROOM AND ELECTRICAL ROOM (B08C0099) MECH NOT INCLUDED, | Remodel | 7/30/2015 | $366,000 | KING COUNTY | 7/17/2018 |
|
COMM14-0029
| CONSTRUCT NEW TWO STORY AIRCRAFT RESCUE AND FIREFIGHTING STATION (ARFF) WITH ASSOCIATED SITE IMPROVEMENT (PREA14-0155) - MECH IS INCLUDED; DEMO WILL BE DONE UNDER A SEPARATE PERMIT, | Remodel | 6/11/2015 | $988,279 | KING COUNTY | 7/29/2019 |
|
COMM14-0040
| CONSTRUCT FABRIC TENT STRUCTURE TO HOUSE VEHICLES AND PORTABLE BATHROOM WITH DECK AND STAIRS, | Remodel | 2/17/2015 | $124,166 | KING COUNTY | 8/18/2015 |
|
MECH14-0432
| REPLACEMENT AND ADDITION OF VARIOUS PIECES OF HVAC EQUIPMENT ON AND INT HE AIR TRAFFIC CONTROL TOWER (ATCT) AND THE TOWER BASE BUILDING (TBB), | Other | 10/7/2014 | $500,000 | KING COUNTY | 8/18/2015 |
|
GRDE14-0011
| GRADING, DRAINAGE AND PARKING FOR PROPOSED DELIVERY CENTER AT KING COUNTY AIRPORT (PMSC13-0034, COMM14-0004, DEMO14-0004) | Other | 7/3/2014 | $0 | SEATTLE | 8/18/2015 |
|
COMM14-0004
| CONSTRUCT BUILDING 3-802 WITH APPR 91,921 SF AND ADDITION OF 4,092 SF TO EXISTING BUILDING 3-800 TO SUPPORT AIRPLANE DELIVERY LOUNGES; MECHANICAL IS INCLUDED. | Building, New | 7/3/2014 | $25,603,088 | SEATTLE | 9/6/2016 |
|
COMM14-0006
| DEMOLISH EXISTING 875 SQ FT STEAM CLEAN BLDG. AND BUILD NEW 950 SQ FT BLDG. MECHANICAL REVIEW IS INCLUDED | Other | 6/17/2014 | $88,711 | SEATTLE | 7/29/2019 |
|
COMM14-0007
| Construction of 1,491 SQ FT pole building over sweep dump area, relocation fire lines. | Building, New | 5/9/2014 | $158,629 | SEATTLE | 8/18/2015 |
|
ADDC14-0010
| Build walls to delineate class areas and provide power outlets for "at-risk" high school ages kids. | Remodel | 5/1/2014 | $25,000 | SEATTLE | 8/31/2016 |
|
DEMO14-0004
| Demolish 28,000 sq ft building to construct new delivery building - SEPA done under PMSC13-0035. | Demolition | 3/11/2014 | $0 | SEATTLE | 7/29/2019 |
|
MECH13-1157
| Mechanical - Replace one roof top cooling unit (HP-2) and one split system (CRU-1 and CU-1) with two roof top units. | Other | 2/3/2014 | $129,371 | SEATTLE | 8/31/2016 |
|
ADDC13-0499
| Modify paint hangers P2 and P4 in building 3-369 and P5 in building 3-380 to accomodate the 737 max and 737 NG airplanes with winglets in the upper and lower position. Project includes structural modifications to walls. | Remodel | 12/16/2013 | $1,240,000 | SEATTLE | 8/28/2017 |
|
ADDC13-0477
| Remove and dispose of existing demountable walls, construct new walls and two new doors in open office areas. | Remodel | 11/25/2013 | $26,000 | SEATTLE | 8/31/2016 |
|
FIRP13-0037
| INSTALL (2) ABOVE GROUND FLAMMABLE COMBUSTABLE LIQUID TANK. | Other | 9/23/2013 | $0 | SEATTLE | 8/18/2015 |
|
ADDC13-0278
| Interior TI to include re-arranging space and removing walls and adding walls on the first and second floors. | Remodel | 8/16/2013 | $39,906 | SEATTLE | 8/31/2016 |
|
ADDC13-0287
| Boeing Budiness Jets Building 7-073 tenant improvement-remodel 2nd floor office area, add new wall, ceiling tile and grid. | Remodel | 8/15/2013 | $64,300 | SEATTLE | 7/8/2014 |
|
ADDC13-030
| KC Airport Bldg 8535 - Tenant improvement - ABC- Remove interior walls that created office space in hangar at KC Airport. | Remodel | 6/10/2013 | $4,000 | SEATTLE | 7/29/2019 |
|
DEMO13-0017
| DEMOLITION OF HANGAR 5 AND ADJOINING OFFICE BUILDING. | Demolition | 3/29/2013 | $0 | SEATTLE | 7/29/2019 |
|
FIRP12-0021
| INSTALLATION OF TWO 15,000 GALLON UNDERGROUND JET FUEL TANKS, 2 DISPENSERS AND ABOVE GROUND PIPING. BLDG PERMIT B12C0017. | Other | 2/15/2013 | $0 | SEATTLE | 8/18/2015 |
|
MECH12-0246
| Boeing Air Terminal and Hangars Mechanical | Other | 11/6/2012 | $180,000 | SEATTLE | 7/8/2014 |
|
B12C0054
| Construction of new modular building use as control room. Reconfigure mechanical piping and new pump room | Accessory, New | 11/6/2012 | $156,104 | SEATTLE | 9/20/2017 |
|
DEMO12-0029
| Demolition of existing nursery office building approx of 10,300 SF of area. | Demolition | 10/11/2012 | $0 | SEATTLE | 9/19/2013 |
|
ADDC12-0075
| Boeing 3-800 building Tenant Improvement, 4th floor reconfiguration | Remodel | 10/9/2012 | $678,590 | SEATTLE | 8/28/2017 |
|
B08C0110
| Construct a 35,000 sf one-story facility consisting of 3700 sf of lobby/office/flight operation space, 3900 sf of maintenance/shop/wash down space and aircraft storage area primarily for business jet aircraft -A08PM154, B08DC002 (Mechanical included) | Building, New | 9/6/2012 | $1,298,535 | SEATTLE | 9/18/2013 |
|
B12C0017
| Construct a single story 32,248 SF hangar and attached 11,721 SF support building containing storage, office, and waiting rooms over two floors. | Building, New | 8/6/2012 | $4,154,917 | SEATTLE | 7/29/2019 |
|
B12C0005
| Construction of a corporate aviation hangar. 22,440 SF and support services facility of 111,833 SF - A11P0109, B08DC002 (Mechanical is not included) | Building, New | 7/26/2012 | $3,417,902 | SEATTLE | 8/18/2015 |
|
B12I0073
| DEMO OF EXISTING BUILDING AT KING COUNTY AIRPORT (AEROCOPTERS HANGAR), | Demolition | 6/25/2012 | $0 | KING COUNTY | 7/29/2019 |
|
B12I0072
| DEMO OF EXISTING BUILDING AT KING COUNTY AIRPORT
(FED EX HANGAR), | Demolition | 6/25/2012 | $0 | KING COUNTY | 7/29/2019 |
|
6312256
| Construct tenant improvements to existing mixed use building for offices on floors 1 & 2, per plan., | Remodel | 4/27/2012 | $300,000 | SEATTLE | 10/23/2012 |
|
B11C0114
| Construct a new hangar as part of the Quad 7 Redevelopment CSDP on KCIA-BoiDC002, A11P0095, | Building, New | 3/8/2012 | $1,424,806 | SEATTLE | 12/6/2012 |
|
B12I0028
| Demo entire 35,000 sq ft multiple story office building. | Demolition | 3/6/2012 | $0 | SEATTLE | 7/29/2019 |
|
B08C0099
| Construction of 2 new hangers GF1 and GF2 designed used primarily for business jet aircraft - mech is included. | Building, New | 2/14/2012 | $1,771,065 | SEATTLE | 12/6/2012 |
|
B11M1581
| Alterations of existing office areas - new grid height walls, finishes and casework. | Remodel | 12/20/2011 | $219,009 | SEATTLE | 7/29/2019 |
|
B08DC002
| Redevlop property with 5 new hangars and associated ramps, taxi way, security fences of 8ft high, parking and all necessary infrastructure and security - demo of existing structures is included - | Other | 12/6/2011 | $317,990 | SEATTLE | 9/16/2013 |
|
B11M1251
| OTCP - REARRANGE EXISTING OFFICE SPACE, CREATE TWO (2) ADDITIONAL CONFERENCE ROOMS, NO STRUCTURAL CHANGES OR CHANGE OF USE. | Other | 10/31/2011 | $109,546 | SEATTLE | 7/29/2019 |
|
6294928
| Demolish existing commercial bdg approximately 9669 sq ft per plan and subject to field inspection. | Demolition | 9/8/2011 | $0 | SEATTLE | 12/6/2012 |
|
B10I0176
| Demolish 2 bldgs. | Demolition | 12/1/2010 | $0 | SEATTLE | 12/6/2012 |
|
B10M0955
| Repair broken truss elements in hangar made of wood.Broken bottom chord truss elements will be replaced with treaded tension rod members and bolts in flexture will be relieved. | Other | 8/5/2010 | $140,000 | SEATTLE | 7/17/2018 |
|
B09C0031
| Demo 2 existing bldgs. New construction of 4 aircraft hangars w/office spaces, 36 parking spaces. | Building, New | 11/16/2009 | $1,142,525 | SEATTLE | 7/17/2018 |
|
B09I0162
| demo of 2 existing bldgs. | Demolition | 8/24/2009 | $0 | SEATTLE | 7/29/2019 |
|
B09Q0042
| extend bldg 10' and remodel bldg. shell for office use. | Remodel | 8/18/2009 | $0 | SEATTLE | 10/30/2012 |
|
B04C0226
| Construction of a hangar building with second floor use as office & storage areas. | Other | 9/12/2007 | $1,572,541 | SEATTLE | 5/4/2009 |
|
B06C0165
| Removal of existing 6,500 SF private aircraft storage bldg & construct a new 22,420 SF pricate aircraft storage bldg. | Accessory, New | 7/26/2007 | $651,550 | SEATTLE | 4/11/2008 |
|
B06C0161
| Partial demoltion of existing building. The areas will be restore as a new aircraft parking apron. | Other | 2/8/2007 | $190,504 | SEATTLE | 8/18/2009 |
|
B0610245
| Demolish existing aircraft hangar. | Demolition | 9/19/2006 | $0 | SEATTLE | 8/18/2009 |
|
B03M12300
| | Remodel | 8/25/2003 | $100,000 | SEATTLE | 8/18/2009 |
|
B02M1132
| | Demolition | 7/15/2002 | $80,000 | SEATTLE | 8/18/2009 |
|
D02-020
| | Remodel | 5/8/2002 | $750,000 | SEATTLE | 3/31/2003 |
|
D02-019
| | Building, New | 5/8/2002 | $4,182,500 | SEATTLE | 3/31/2003 |
|
M102-011
| | Demolition | 4/26/2002 | $64,700 | SEATTLE | 8/18/2009 |
|
B02M0328
| | Accessory, New | 3/4/2002 | $6,000 | SEATTLE | 4/4/2003 |
|
B01M2012
| | Other | 12/5/2001 | $194,000 | SEATTLE | 4/4/2003 |
|
B01M0988
| | Remodel | 11/27/2001 | $500,000 | SEATTLE | 8/18/2009 |
|
B01M0438
| | Other | 10/12/2001 | $200,000 | SEATTLE | 4/4/2003 |
|
B01M1124
| | Other | 9/17/2001 | $191,558 | SEATTLE | 4/22/2002 |
|
B00M0154
| | Other | 5/23/2001 | $1,260,110 | SEATTLE | 7/20/2001 |
|
B01F0195
| | Other | 3/23/2001 | $0 | SEATTLE | 7/13/2001 |
|
B01F0064
| | Other | 3/2/2001 | $0 | SEATTLE | 7/13/2001 |
|
B98C0235
| None | Other | 7/29/1999 | $1,153,112 | SEATTLE | 3/24/2000 |
|
B99A0850
| None | Other | 3/4/1999 | $0 | SEATTLE | |
|
B97C0058
| | Building, New | 12/24/1997 | $12,214,000 | | |
|
B97A4195
| | Remodel | 11/6/1997 | $0 | | |
|
B96C0121
| | Remodel | 11/6/1997 | $352,000 | | |
|
B97A3264
| | Accessory, New | 9/23/1997 | $0 | | |
|
B97A3334
| | Building, New | 9/5/1997 | $2,000 | | |
|
B97A2498
| | Demolition | 7/11/1997 | $0 | | |
|
| | Remodel | 10/20/1994 | $50,000 | | |
|
| | Remodel | 5/25/1993 | $140,000 | | |
|
| | Building, New | 10/8/1992 | $400,000 | | |
|
|
|