| Parcel | 334040-3805 |
| Name | EWA 1415 MAPLE OWNER LLC |
| Site Address | 1415 MAPLE AVE SW 98055 |
| Geo Area |
70-40
|
| Spec Area |
|
| Property Name | WAREWHOUSE |
|
| Jurisdiction | RENTON |
| Levy Code | 2100 |
| Property Type |
C
|
| Plat Block / Building Number | 22 |
| Plat Lot / Unit Number | 16 THRU 25 & |
| Quarter-Section-Township-Range |
NW-19-23-5
|
|
|
|
| Highest & Best Use As If Vacant | MANUFACTURING |
| Highest & Best Use As Improved | PRESENT USE |
| Present Use | High Tech/High Flex |
| Land SqFt | 81,893 |
| Acres | 1.88 |
|
| Percentage Unusable | |
| Unbuildable | NO |
| Restrictive Size Shape | NO |
| Zoning | CA |
| Water | WATER DISTRICT |
| Sewer/Septic | PUBLIC |
| Road Access | PUBLIC |
| Parking | ADEQUATE |
| Street Surface | PAVED |
|
|
Views |
Waterfront |
| Rainier | |
| Territorial | |
| Olympics | |
| Cascades | |
| Seattle Skyline | |
| Puget Sound | |
| Lake Washington | |
| Lake Sammamish | |
| Lake/River/Creek | |
| Other View | |
|
| Waterfront Location | |
| Waterfront Footage | 0 |
| Lot Depth Factor | 0 |
| Waterfront Bank | |
| Tide/Shore | |
| Waterfront Restricted Access | |
| Waterfront Access Rights | NO |
| Poor Quality | NO |
| Proximity Influence | NO |
|
|
Designations |
Nuisances |
| Historic Site | |
| Current Use | (none) |
| Nbr Bldg Sites | |
| Adjacent to Golf Fairway | NO |
| Adjacent to Greenbelt | NO |
| Other Designation | NO |
| Deed Restrictions | NO |
| Development Rights Purchased | NO |
| Easements | NO |
| Native Growth Protection Easement | NO |
| DNR Lease | NO |
|
| Topography | |
| Traffic Noise | |
| Airport Noise | |
| Power Lines | NO |
| Other Nuisances | NO |
|
|
Problems |
| Water Problems | NO |
| Transportation Concurrency | NO |
| Other Problems | NO |
|
|
Environmental |
|
Section(s) Of Building Number:
1
|
1
| STORAGE WAREHOUSE (406) | | 1 | 28 | | 33,835 | 33,835 |
Section Feature(s) Of Section Number:
1
| Feature Type | Gross Sq Ft | Net Sq Ft |
| MEZZANINES-OFFICE (761) | 6,224 | 6,224 |
|
| 334040380506 | 2026 | 2027 | | 2100 | 2,190,600 | 5,305,900 | 7,496,500 | 0 | 0 | 0 | 0 | OP |
| 334040380506 | 2025 | 2026 | | 2100 | 1,883,500 | 5,372,000 | 7,255,500 | 0 | 0 | 0 | 0 | OP |
| 334040380506 | 2024 | 2025 | | 2100 | 1,883,500 | 5,258,900 | 7,142,400 | 0 | 0 | 0 | 0 | OP |
| 334040380506 | 2023 | 2024 | | 2100 | 1,863,000 | 4,932,000 | 6,795,000 | 691,100 | 0 | 0 | 0 | OP |
| 334040380506 | 2022 | 2023 | | 2100 | 1,781,100 | 4,665,400 | 6,446,500 | 0 | 0 | 0 | 0 | OP |
| 334040380506 | 2021 | 2022 | | 2100 | 1,781,100 | 3,956,000 | 5,737,100 | 0 | 0 | 0 | 0 | OP |
| 334040380506 | 2020 | 2021 | | 2100 | 1,596,900 | 2,960,700 | 4,557,600 | 75,000 | 0 | 0 | 0 | OP |
| 334040380506 | 2019 | 2020 | | 2100 | 1,596,900 | 2,831,300 | 4,428,200 | 0 | 0 | 0 | 0 | OP |
| 334040380506 | 2018 | 2019 | | 2100 | 1,330,700 | 4,554,800 | 5,885,500 | 0 | 0 | 0 | 0 | OP |
| 334040380506 | 2017 | 2018 | | 2100 | 1,207,900 | 3,705,500 | 4,913,400 | 0 | 0 | 0 | 0 | OP |
| 334040380506 | 2016 | 2017 | | 2100 | 1,146,500 | 3,389,000 | 4,535,500 | 0 | 0 | 0 | 0 | OP |
| 334040380506 | 2015 | 2016 | | 2100 | 1,146,500 | 3,389,000 | 4,535,500 | 0 | 0 | 0 | 0 | OP |
| 334040380506 | 2014 | 2015 | | 2100 | 1,064,600 | 3,470,900 | 4,535,500 | 0 | 0 | 0 | 0 | OP |
| 334040380506 | 2013 | 2014 | | 2100 | 1,064,600 | 3,187,400 | 4,252,000 | 0 | 0 | 0 | 0 | OP |
| 334040380506 | 2012 | 2013 | | 2100 | 982,700 | 3,269,300 | 4,252,000 | 0 | 0 | 0 | 0 | OP |
| 334040380506 | 2011 | 2012 | | 2100 | 982,700 | 3,406,500 | 4,389,200 | 0 | 0 | 0 | 0 | OP |
| 334040380506 | 2010 | 2011 | | 2100 | 982,700 | 3,406,500 | 4,389,200 | 0 | 0 | 0 | 0 | OP |
| 334040380506 | 2009 | 2010 | | 2100 | 982,700 | 3,556,800 | 4,539,500 | 0 | 0 | 0 | 0 | OP |
| 334040380506 | 2008 | 2009 | | 2100 | 982,700 | 3,400,600 | 4,383,300 | 0 | 0 | 0 | 0 | OP |
| 334040380506 | 2007 | 2008 | | 2100 | 818,900 | 3,281,000 | 4,099,900 | 0 | 0 | 0 | 0 | OP |
| 334040380506 | 2006 | 2007 | | 2110 | 818,900 | 2,497,700 | 3,316,600 | 0 | 0 | 0 | 0 | OP |
| 334040380506 | 2005 | 2006 | | 2110 | 655,500 | 2,230,900 | 2,886,400 | 0 | 0 | 0 | 0 | OP |
| 334040380506 | 2004 | 2005 | | 2110 | 655,500 | 2,230,900 | 2,886,400 | 0 | 0 | 0 | 0 | OP |
| 334040380506 | 2003 | 2004 | | 2110 | 655,500 | 2,198,500 | 2,854,000 | 0 | 655,500 | 2,198,500 | 2,854,000 | |
| 334040380506 | 2002 | 2003 | | 2110 | 573,500 | 2,254,000 | 2,827,500 | 0 | 573,500 | 2,254,000 | 2,827,500 | |
| 334040380506 | 2001 | 2002 | | 2110 | 573,500 | 3,518,100 | 4,091,600 | 0 | 573,500 | 3,518,100 | 4,091,600 | |
| 334040380506 | 2000 | 2001 | | 2110 | 573,500 | 3,109,200 | 3,682,700 | 2,000,600 | 573,500 | 3,109,200 | 3,682,700 | |
| 334040380506 | 1999 | 2000 | | 2110 | 409,700 | 1,108,600 | 1,518,300 | 0 | 409,700 | 1,108,600 | 1,518,300 | |
| 334040380506 | 1998 | 1999 | | 2110 | 409,700 | 1,108,600 | 1,518,300 | 0 | 409,700 | 1,108,600 | 1,518,300 | |
| 334040380506 | 1997 | 1998 | | 2110 | 0 | 0 | 0 | 0 | 409,700 | 1,108,600 | 1,518,300 | |
| 334040380506 | 1996 | 1997 | | 2110 | 0 | 0 | 0 | 0 | 409,700 | 1,108,600 | 1,518,300 | |
| 334040380506 | 1995 | 1996 | | 2110 | 0 | 0 | 0 | 0 | 409,700 | 1,108,600 | 1,518,300 | |
|
|
2979479
|
20190328000343
|
3/26/2019
| $4,575,000.00 | SPRINT COMMUNICATIONS COMPANY LP | EWA 1415 MAPLE OWNER LLC | Bargain and Sales Deed | None |
|
2058975
|
20040730001411
|
7/23/2004
| $5,800,000.00 | WAPO INVESTMENTS LLC | SPRINT COMMUNICATIONS COMPANY LP | Statutory Warranty Deed | None |
|
1699415
|
19990722001440
|
7/20/1999
| $2,800,000.00 | SHIH FAMILY LP | WAPO INVESTMENTS LLC | Statutory Warranty Deed | None |
|
1461386
|
199512151992
|
10/10/1995
| $0.00 | SHIH DAVID+EVA H | SHIH FAMILY LIMITED PARTNERSHIP | Statutory Warranty Deed | Other |
|
|
|
E26002845
| installing 4 new 120volt 20 amp ckts for cord drops, | | 6/3/2026 | $9,000 | RENTON | |
|
E26002554
| supply (1) 3ph 208v 50amp circuit, | | 5/18/2026 | $8,000 | RENTON | |
|
E26001310
| supply (3) 120v 20amp circuits for workstations, | | 3/17/2026 | $4,000 | RENTON | |
|
E26001154
| supply (1) 50amp 208v circuit, | | 3/6/2026 | $3,000 | RENTON | |
|
E26001071
| install (2) recessed LED can lights, | | 3/3/2026 | $1,000 | RENTON | |
|
E26000940
| Alter (6) 60A existing circuits Add (6) 60A existing circuits and Alter (2) 20A existing circuits, | | 2/23/2026 | $14,000 | RENTON | |
|
E26000906
| supply (1) 120v 20amp circuit, | | 2/20/2026 | $1,000 | RENTON | |
|
E26000513
| supplying (1) 120v receptacle for meters, | | 1/30/2026 | $1,500 | RENTON | |
|
E25005975
| supply (3) 1ph 208v 20amp circuits with receptacle, | | 11/21/2025 | $1,500 | RENTON | |
|
E25005861
| New 480v 60amp ckt And new 50amp 208v ckt for control cabinet, | | 11/17/2025 | $10,000 | RENTON | |
|
E25005082
| supply new LED lighting in warehouse and office space, | | 10/7/2025 | $25,000 | RENTON | |
|
E25004823
| supply up to (7) 120v 30amp circuits, | | 9/22/2025 | $5,000 | RENTON | |
|
E25004554
| New dedicated circuit., | | 9/9/2025 | $2,900 | RENTON | |
|
E25000427
| REPLACING DAMAGED LIGHT POLE & HEAD, | | 1/27/2025 | $2,500 | RENTON | 5/1/2025 |
|
E24006303
| Install (2) ded. circuits and disconnects for environmental chamber equipment connection. Relocate (1) cord drop, | | 12/17/2024 | $11,000 | RENTON | 5/1/2025 |
|
E24006182
| supply (1) 3ph 480v 60am circuit (1) 3ph 208v 30amp circuit (3) 120v 20amp circuits, | | 12/11/2024 | $12,000 | RENTON | 5/1/2025 |
|
E24005608
| Blue Origin - Davinci Fuel Cell Test Rm 124- Provide and Install (7) altered 20A circuits/existing Add (6) 60A existing circuits Alter (7) 20A existing crts explosion proof rcpt (NOTE Class I Div II Hazardous Location), | | 11/22/2024 | $21,000 | RENTON | 5/1/2025 |
|
E24005804
| installing a new 480v 3 phase 20 amp ckt, | | 11/18/2024 | $300 | RENTON | 5/1/2025 |
|
E24005415
| Installing Low voltage Conduit and Sensors, | | 10/24/2024 | $52,000 | RENTON | 7/9/2025 |
|
M24005083
| Install small process chiller and piping Note: No plan review required based on description of work and/or fixtures selected. Attachment was not reviewed for approval and is for reference only., | Other | 10/4/2024 | $7,500 | RENTON | 5/1/2025 |
|
M24005081
| HVAC modifications Note: No plan review required based on description of work and/or fixtures selected. Attachment was not reviewed for approval and is for reference only., | Other | 10/4/2024 | $90,000 | RENTON | 5/1/2025 |
|
E24004407
| Security. Security Panel-1 Security Devices-4 Job 835671, | | 8/29/2024 | $5,010 | RENTON | 5/1/2025 |
|
E24004358
| lBlue Origin Davinci Bldg Fuel Cell Room 124A. Low voltage detection and controls for clean agent fire suppression system in fuel cell room 124a. NOTE: Attachment was not reviewed for approval and is for reference only., | | 8/27/2024 | $6,000 | RENTON | 7/9/2025 |
|
E24003818
| Security Access Controls for 1 gate Job 835593, | | 7/25/2024 | $1,950 | RENTON | 5/1/2025 |
|
B24000149
| BLUE ORIGIN DAVINCI - DESIGN AND INSTALLATION OF A CLOSED SYSTEM FUEL CELL TEST LABORATORY IMPROVEMENTS IN EXISTING RESEARCH/INDUSTRIAL BUILDING. TI IN ROOM 124 & 124A ALONG WITH OUTSIDE STORAGE OF GAESEOUS COMMODITIES FOR TESTING LAB. OWNER ACTI | Remodel | 4/17/2024 | $500,000 | RENTON | 5/1/2025 |
|
E24001518
| Installation of Tele / Data cable to Fuel Cell Area, | | 3/25/2024 | $16,669 | RENTON | 5/1/2025 |
|
M23006359
| Install an exhaust fan and associated ducting. Note: No plan review required based on description of work. Attachment was not reviewed for approval and is for reference only. Inspector: No plan review required based on description of work. Attachment | Other | 12/28/2023 | $30,000 | RENTON | 7/2/2024 |
|
M23006171
| Install 9-ea fan filter units, | Other | 12/12/2023 | $30,000 | RENTON | 5/1/2025 |
|
B23005605
| REPLACE CONCRETE SLAB WITH REINFORCED SLAB AND FOOTINGS FOR EQUIPMENT., | Remodel | 11/27/2023 | $43,000 | RENTON | 5/1/2025 |
|
B23003001
| BLUE ORIGIN/DAVINCI BLDG- FOOTINGS AND STRUCTURAL WORK FOR NEW COLD -SPRAY PAINT BOOTH AND AIR SCRUBBING EQUIPMENT., | Remodel | 6/29/2023 | $42,500 | RENTON | 7/9/2025 |
|
E23003414
| BLUE ORIGIN FUEL CELL TESTING LAB. LOW VOLTAGE DETECTION AND CONTROLS FOR CLEAN AGENT FIRE SUPPRESSION IN THE FUEL CELL TESTING LAB. NOTE: No plan review required based on description of work. Attachment was not reviewed for approval and is for refe, | | 6/28/2023 | $28,000 | RENTON | 5/1/2025 |
|
E23003355
| BLUE ORIGIN DA VINCI BLDG. low voltage detection and controls for fire suppression system in cold spray booth. NOTE: No plan review required based on description of work. Attachment was not reviewed for approval and is for reference only., | | 6/23/2023 | $18,000 | RENTON | 5/1/2025 |
|
E23002978
| New Street Light crosswalk signals signal service replacement, | | 6/6/2023 | $47,000 | RENTON | 7/2/2024 |
|
E23001821
| PROJECT IS TO REPLACE THE EXISITING CELLULAR FIRE ALARM COMMUNICATOR WITH AN AES RADIO, | | 4/7/2023 | $2,370 | RENTON | 7/26/2023 |
|
E23000888
| Installation of Tele/Data cable throughout, | | 2/17/2023 | $67,834 | RENTON | 5/1/2025 |
|
B22004196
| INSTALLATION OF MODIFIED SHIPPING CONTAINER TO ACT AS A FUEL TEST LAB IN THE PARKING AREA OF BLUE ORIGIN'S FACILITY. OWNER ACTING AS CONTRACTOR., | Remodel | 1/4/2023 | $300,000 | RENTON | 7/2/2024 |
|
E22006658
| 11 Access control doors and 1 Access control panel with a 120v connection Job #834489, | | 12/29/2022 | $16,000 | RENTON | 7/2/2024 |
|
E22005962
| LOW VOLTAGE DETECTION AND CONTROLS FOR BLDG FIRE ALARM UPGRADE, | | 11/10/2022 | $14,000 | RENTON | 7/26/2023 |
|
E22004900
| Furnish and install 24 low voltage thermostats and associated wires, | | 9/14/2022 | $55,000 | RENTON | 7/2/2024 |
|
E22004636
| 2 - 70amp 208v 3 phase ckts 4 - 30amp 208v phase ckts 2 - 30amp 480v phase ckts, | | 8/31/2022 | $15,000 | RENTON | 5/11/2023 |
|
E22004584
| New 200amp service so new 480v and 120/208v panel and new 75kva transformer, | | 8/29/2022 | $20,000 | RENTON | 5/11/2023 |
|
M22003156
| Blue Origin/DaVinci Building- Install new heating and air conditioning systems, | Other | 8/16/2022 | $1,250,000 | RENTON | 7/26/2023 |
|
E22004287
| 2201366 - Heat Trace, | | 8/11/2022 | $1,000 | RENTON | 5/11/2023 |
|
E22003839
| 7 new 3 phase 208v receptacles for compressor's, | | 7/21/2022 | $5,000 | RENTON | 5/11/2023 |
|
E22003656
| Relocation of equipment 3 - 50 amp 208v 3 phase ckt 2 - 30 amp 208v 3 phase ckt 1 - 100amp 480v 3 phase ckt, | | 7/14/2022 | $15,000 | RENTON | 5/11/2023 |
|
E22003655
| New 208v 80amp 3 phase ckt 230v 50amp 3 phase ckt 2 - 208v 30amp 3 phase ckt 208v 20amp 1 phase ckt 50 amp 480v 3 phase ckt 30 amp 208v 3 phase ckt, | | 7/14/2022 | $18,000 | RENTON | 5/11/2023 |
|
E22003654
| New 200amp service so new 480v and 120/208v panel and new 75kva transformer, | | 7/14/2022 | $10,000 | RENTON | 5/11/2023 |
|
E22003166
| ELECTRICAL TENANT IMPROVEMENT FOR INDUSTRIAL LABS, | | 6/28/2022 | $1,800,000 | RENTON | 7/2/2024 |
|
E22003123
| LOW VOLTAGE DETECTION AND CONTROLS FOR CLEAN AGENT FIRE SUPPRESSION IN ROOMS 122221 AND 222, | | 6/15/2022 | $45,000 | RENTON | 7/26/2023 |
|
E22002310
| Add/Alter (20) 20A Circuits, | | 5/2/2022 | $15,400 | RENTON | 7/2/2024 |
|
P22002250
| Blue Origin DaVinci Building rough in for kitchen sink toilet and water heater - 13 fixtures, | | 4/28/2022 | $5,000 | RENTON | 7/2/2024 |
|
E22001437
| Add (3) 20A altered circuits, | | 3/22/2022 | $13,300 | RENTON | 7/8/2022 |
|
E22001413
| Provide and Install: (1) New Service/ Largest New Feeder (101-200 Amp), | | 3/21/2022 | $35,000 | RENTON | 7/2/2024 |
|
E22000649
| supply (1) 200amp 120/208v panel and 75KVA transformer, | | 2/8/2022 | $10,000 | RENTON | 5/11/2023 |
|
E21006156
| Installation of Tele/Data cable on Floors 1 and 2 for Blue Origin, | | 12/28/2021 | $76,775 | RENTON | 7/8/2022 |
|
E21006045
| Add: 200amp 480v panel :75kva transformer :200amp 120/208v panel :(8) 120v circuits (6) 3ph 208v 50amp circuits (1) 60amp 208v circuit (2) 208v 20amp circuits (1) 3ph 100amp 480v circuit (1) 1ph 208v RTU circuit : (22) data chase locatio | | 12/17/2021 | $30,000 | RENTON | 7/8/2022 |
|
B19006197
| 405 COMMERCE CENTER. CHANGE OF OCCUPANCY FROM A COMMUNICATIONS DATA CENTER TO A WAREHOUSE W/OFFICE SPACE. THE EXISTING BUILDING IS 2 STORIES AND 40050 SQ FT. SCOPE OF WORK INCLUDESDEMOLITION OF EXTERIOR ENCLOSED REFRIGERATION ROOM WALLS; DEMOLITION O | Remodel | 2/17/2020 | $75,000 | RENTON | 5/22/2020 |
|
B000303
| | Other | 5/10/2000 | $275,000 | RENTON | 7/13/2001 |
|
B000073
| None | Other | 4/12/2000 | $3,104,106 | RENTON | 7/13/2001 |
|
B000051
| None | Other | 4/12/2000 | $1,072,000 | RENTON | 7/13/2001 |
|
| | Remodel | 3/3/1997 | $102,350 | | |
|
| | Remodel | 1/20/1997 | $3,000 | | |
|
|
|
Reference Links:
Notice mailing date: 07/16/2026
|
|