E26001610
| Replace 100 amp electrical panel with a newer/better quality panel., | | 4/13/2026 | $4,500 | RENTON | 7/21/2026 |
|
M26000560
| Replace (1) gas fired boiler in same location per plan. BUILDING: J | FLOOR: 3 | ROOM: 305. Note - attachment was not reviewed and is for reference only., | Other | 2/2/2026 | $141,999 | RENTON | 7/21/2026 |
|
E25005657
| Add a Bosch keypad siren and outdoor motion detector including new wire and raceway as required, | | 11/4/2025 | $2,450 | RENTON | 7/21/2026 |
|
M24005849
| Renton Technical College Building D Multicultural Center Diffuser Modification. 25 new diffusers and 8" duct work, | Other | 12/10/2024 | $15,000 | RENTON | 7/21/2025 |
|
E24004771
| Low Voltage HVAC Energy Management Controls System on (13) WSHP's, | | 9/19/2024 | $10,150 | RENTON | 7/21/2025 |
|
E24004295
| DATA CABLING, | | 8/22/2024 | $66,000 | RENTON | 9/10/2024 |
|
P24004075
| Add new sink with dishwasher connections and wall box for refrigerator connection., | | 8/12/2024 | $10,000 | RENTON | 9/10/2024 |
|
M24000521
| Renton Technical College Bldg J. Mechanical work of the classroom remodel entails the removal and demolition of existing diffusers and ducts. Installing a new mini split system new ducts HVAC and diffusers from existing units. NOTE: No plan review re | Other | 7/17/2024 | $70,000 | RENTON | 9/10/2024 |
|
E24003116
| RENTON TECHNICAL COLLEGE BLDG D. HVAC UPGRADES, | | 7/10/2024 | $35,000 | RENTON | 9/10/2024 |
|
E24003207
| Installing 44 Cat 6A Cables, | | 6/25/2024 | $15,000 | RENTON | 7/22/2024 |
|
M23006049
| Renton Technical College Bldg D. Demolition of existing mechanical rooftop unit. Replace with DOAS for ventilation and VRF system heat pump system. Work includes associated electrical/controls and roof curbs and roofing repair., | Other | 6/13/2024 | $380,000 | RENTON | 7/22/2024 |
|
B23006348
| RENTON TECHNICAL COLLEGE BLDG D-DEMO OF EXISTING RTU. REPLACE WITH VRF AND DOAS. WORK INCLUDES ASSOCIATED STRUCTURAL UPGRADES CURBS ELECTRICAL/CONTROLS, | Remodel | 5/30/2024 | $380,000 | RENTON | 7/22/2024 |
|
E24002213
| Renton Technical College Building D Multicultural Center Remodel, | | 5/9/2024 | $98,000 | RENTON | 7/22/2024 |
|
P24002409
| Renton Technical College Bldg D. Install new sink as part of a remodel in Building D of the Renton Technical College, | | 5/8/2024 | $2,500 | RENTON | 7/22/2024 |
|
B23006249
| RENTON TECHNICAL COLLEGE BLDG D. INTERIOR RENOVATION OF BUILDING. REPLACE TWO WINDOWS. ADD TWO WINDOWS., | Remodel | 5/2/2024 | $805,000 | RENTON | 7/22/2024 |
|
E24000688
| Renton Technical College Bldg J. Renovation of existing classrooms, | | 4/12/2024 | $300,000 | RENTON | 7/22/2024 |
|
B24001410
| Renton Technical College Bldg A. Furnish and install a fully adhered white/gray fleece backed 60mil Duro Fleece PVC Roof System according to manufacturer's specifications and warranty requirements. (, | Remodel | 3/19/2024 | $192,000 | RENTON | 7/22/2024 |
|
B23003098
| RTC - Building J Phase 2 partial demolition of 11154 sq ft interior partitions to construct 5 new classrooms internet cafe storage room and new data room, | Remodel | 9/27/2023 | $1,473,100 | RENTON | 7/22/2024 |
|
BLDG J
| RTC Building J - Phase 2 Construct 5 Classrooms, | Other | 8/6/2023 | $0 | RENTON | 7/22/2024 |
|
BLDG J
| Renton Technical College Bldg J 1st Floor Remodel #WA23028, | Other | 5/17/2023 | $0 | RENTON | 7/22/2024 |
|
E23001923
| Comms data cabling installation consisting of a wired and wireless network system in the RTC office. Includes 1 control unit with 36 outlets/devices., | | 4/12/2023 | $19,820 | RENTON | 7/22/2024 |
|
E23001165
| Renton Technical College Building J First Floor Remodel Phase 1. 1st Floor Remodel, | | 3/16/2023 | $62,278 | RENTON | 7/22/2024 |
|
M23000865
| Renton Technical College J Building First Floor. Demolition of existing ducts for 2 classrooms and related offices. Install new ducts for new office Suite and offices., | Other | 2/16/2023 | $80,000 | RENTON | 7/21/2025 |
|
B22005282
| DEMOLITION OF TWO CLASSROOMS AND ADDITION OF ONE OFFICE SUITE. REMODELING OF ONE CLASSROOMS AND CLUB/CONFERENCE ROOM., | Remodel | 2/10/2023 | $700,000 | RENTON | 7/22/2024 |
|
BLDG J
| RTC BLDG J TI, | Other | 1/29/2023 | $0 | RENTON | 8/7/2023 |
|
BLDG B
| BLDG. B Boiler replacement, | | 10/28/2022 | $0 | RENTON | 1/24/2023 |
|
BLDG B
| RTC Building B Boiler Replacement, | Other | 1/1/2022 | $0 | RENTON | 8/22/2022 |
|
E21006054
| Install a 100amp single phase disconnect to a t pole, | | 12/17/2021 | $5,800 | RENTON | 8/22/2022 |
|
E21002008
| Adding one additional ceiling strobe (SCWL) to an existing system., | | 5/5/2021 | $1,583 | RENTON | 8/22/2022 |
|
E20004243
| VEC #16634. Install conduit and wire for Fire Alarm Upgrade. Joint venture with ADT & Forma Construction., | | 9/18/2020 | $30,000 | RENTON | 6/15/2021 |
|
E20003124
| replace existing 600 amp busway with new 600 amp busway, | | 8/4/2020 | $44,000 | RENTON | 6/15/2021 |
|
M20002947
| Replace Exhaust Fans and Make-up Air Units for Welding Shop, | Other | 7/28/2020 | $50,000 | RENTON | 6/15/2021 |
|
P20003241
| Relocate @ replace water heater. Install roof and overflow drain, | | 7/24/2020 | $5,000 | RENTON | 6/15/2021 |
|
B19006296
| NEW 300 SF ADDITION TO TIG WELDING CLASSROOM AND 5750 SF ALTERATION TO EXISTING INTERIOR - BLDG A, | Remodel | 4/22/2020 | $515,634 | RENTON | 8/22/2022 |
|
M19005423
| RENTON TECHNICAL COLLEGE BLDG A WELDING PROGRAM. INSTALLATION OF A NEW OXYGEN MAINIFOLD FOR THE WELDING PROGRAM PER THE CURRENT IMC AND PLUMBING CODE., | Other | 10/9/2019 | $1,200 | RENTON | 7/8/2020 |
|
B18004194
| REMOVAL OF EXISTING CONCRETE TILE ROOFING AND INSTALLATION OF NEW SHEET METAL ROOFING. ROOF INSULATION IS BELOW DECK. 5" POLY ISO ONTO DECK PART OF DESIGN., | Remodel | 8/23/2018 | $678,900 | RENTON | 8/1/2019 |