PMF26-03952
| Yarrow Shores Condo Association [parking garage]: [1] Hot Water Heater, | | 6/4/2026 | $2,574 | KIRKLAND | |
|
ESF26-02354
| Vining: [8] Light Fixture - circuit, | | 4/2/2026 | $800 | KIRKLAND | |
|
BNO23-00948
| DOCK DECK BOARD REPAIR: Replace approximately 10% deck boards with new like lumber., | Other | 4/11/2023 | $13,500 | KIRKLAND | |
|
MMF22-09724
| Cole Swap (Mech): Installing (1) AC unit (roof-top, like-for-like, see spec sheet for original unit)., | Other | 1/5/2023 | $1,200 | KIRKLAND | |
|
MMF22-06913
| Yarrow Shores Condos - Waldbaum (#301): Remove existing gas furnace and air conditioning equipment. Install new gas furnace and air conditioning equipment like and kind., | Other | 9/9/2022 | $20,000 | KIRKLAND | |
|
BMF21-05616
| YARROW SHORES Garage Repair: Along the north and east elevations of the approximately nine foot tall concrete garage wall, the interior face of the concrete is damaged and spalling. The structural scope of repair includes removing and patching the sp | Other | 11/19/2021 | $99,960 | KIRKLAND | |
|
PMF20-06622
| Yarrow Shores Condos-A (Multifamily Residential Alteration) project installing (Back Flow Preventer; Piping - Water Service; Total Number of Fixtures; Shed or Outbuilding; There are 10 or less new or altered fixtures.)., | | 10/1/2020 | $1,250 | KIRKLAND | |
|
EMF18-04359
| | | 6/25/2018 | $2,000 | KIRKLAND | |
|
BNO18-04041
| Yarrow Shores Condo Association Dock Repair: Replace selective deck boards on yarrow shores dondo dock, | Other | 6/13/2018 | $3,500 | KIRKLAND | 9/5/2019 |
|
PMF18-02923
| Thilenn reisdence - Unit 201 - Remodel of two bathrooms and kitchen., | | 5/24/2018 | $8,000 | KIRKLAND | 9/5/2019 |
|
ELV18-03489
| THILEN: Project installing (4 CATV or closed circuit coaxial cable; 6 Speaker Wire; Primary Building; 6 Data cable system; 2 Telecommunication system)., | | 5/24/2018 | $4,000 | KIRKLAND | 9/5/2019 |
|
PSF18-02853
| A (Single Family Residential Alteration) project installing (Toilet; Bathroom Sink; Laundry Tub; Dishwasher; Clothes Washer; Hot Water Heater; Shower, Tub or Combo; Kitchen Sink; Plumbing Fixtures Per Plans; Ice Maker; Single Family Dwelling). Additi | | 4/30/2018 | $8,000 | KIRKLAND | 9/5/2019 |
|
EMF18-02457
| Thilen Unit 204-Complete remodel of unit. (related to BMF18-00395), | | 4/17/2018 | $15,000 | KIRKLAND | 9/5/2019 |
|
MMF18-02437
| Sternoff: installing 1 Air Handler, | Other | 4/12/2018 | $13,340 | KIRKLAND | 9/5/2019 |
|
MSF18-02377
| INCORRECT PERMIT TYPE. STERNOFF: Installing (Mech Equipment Per Plans; Total Number of Appliances; Other Structure; Furnace). Additional Info (). Work Site Location (), | Other | 4/11/2018 | $13,340 | KIRKLAND | 9/5/2019 |
|
BMF18-00395
| Thilen Condo (Unit 201): Interior remodel of existing condo unit including Kitchen, Bathrooms and Utility Room & ;Remodel interior partitions to add (1) additional bedroom, replace existing window in existing window opening., | Building, New | 3/13/2018 | $350,000 | KIRKLAND | 9/5/2019 |
|
PUB16-07363
| Install cleanout on side sewer, | Other | 8/17/2016 | $0 | KIRKLAND | 9/5/2019 |